Development Of Preliminary Design For Tidal Power Plant At Kuching Barrage

This Final Year Project report describes the necessities of tidal energy and operation of existing tidal power plants across the globe. There are thousands of operating tidal power plants in the world because tidal energy harnessing is one of the methods to overcome the issues of fossil fuels short...

Full description

Saved in:
Bibliographic Details
Main Author: Norman Baggio, Francis
Format: Final Year Project Report
Language:English
Published: Universiti Malaysia Sarawak (UNIMAS) 2018
Subjects:
Online Access:http://ir.unimas.my/id/eprint/33690/4/Norman%20Baggio.pdf
http://ir.unimas.my/id/eprint/33690/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.unimas.ir.33690
record_format eprints
spelling my.unimas.ir.336902024-04-22T02:06:03Z http://ir.unimas.my/id/eprint/33690/ Development Of Preliminary Design For Tidal Power Plant At Kuching Barrage Norman Baggio, Francis TJ Mechanical engineering and machinery This Final Year Project report describes the necessities of tidal energy and operation of existing tidal power plants across the globe. There are thousands of operating tidal power plants in the world because tidal energy harnessing is one of the methods to overcome the issues of fossil fuels shortage. This report also introduces Kuching Barrage, a flood mitigation system located in Kuching, Sarawak. It has the potential to become a tidal power plant. There are plans and studies conducted by local researchers to convert the barrage from a flood mitigation system to a functional tidal power plant. However, the idea has never been approved by the government due to internal reasons. Therefore, this project is introduced in hopes that the government will eventually approve of the idea. There are four objectives in this project, which are to determine the mean tidal range and potential annual power output at Kuching Barrage, to select the best type of tidal turbine for the proposed tidal power plant, to study all the parameters of the selected turbine, as well as to perform a numerical analysis on the gate opening for varying tide levels. Based on the main findings, all the objectives are successfully achieved, although there is some undesired result. Hence, a recommendation is suggested to overcome the unexpected engineering hurdle. Universiti Malaysia Sarawak (UNIMAS) 2018 Final Year Project Report NonPeerReviewed text en http://ir.unimas.my/id/eprint/33690/4/Norman%20Baggio.pdf Norman Baggio, Francis (2018) Development Of Preliminary Design For Tidal Power Plant At Kuching Barrage. [Final Year Project Report] (Unpublished)
institution Universiti Malaysia Sarawak
building Centre for Academic Information Services (CAIS)
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Sarawak
content_source UNIMAS Institutional Repository
url_provider http://ir.unimas.my/
language English
topic TJ Mechanical engineering and machinery
spellingShingle TJ Mechanical engineering and machinery
Norman Baggio, Francis
Development Of Preliminary Design For Tidal Power Plant At Kuching Barrage
description This Final Year Project report describes the necessities of tidal energy and operation of existing tidal power plants across the globe. There are thousands of operating tidal power plants in the world because tidal energy harnessing is one of the methods to overcome the issues of fossil fuels shortage. This report also introduces Kuching Barrage, a flood mitigation system located in Kuching, Sarawak. It has the potential to become a tidal power plant. There are plans and studies conducted by local researchers to convert the barrage from a flood mitigation system to a functional tidal power plant. However, the idea has never been approved by the government due to internal reasons. Therefore, this project is introduced in hopes that the government will eventually approve of the idea. There are four objectives in this project, which are to determine the mean tidal range and potential annual power output at Kuching Barrage, to select the best type of tidal turbine for the proposed tidal power plant, to study all the parameters of the selected turbine, as well as to perform a numerical analysis on the gate opening for varying tide levels. Based on the main findings, all the objectives are successfully achieved, although there is some undesired result. Hence, a recommendation is suggested to overcome the unexpected engineering hurdle.
format Final Year Project Report
author Norman Baggio, Francis
author_facet Norman Baggio, Francis
author_sort Norman Baggio, Francis
title Development Of Preliminary Design For Tidal Power Plant At Kuching Barrage
title_short Development Of Preliminary Design For Tidal Power Plant At Kuching Barrage
title_full Development Of Preliminary Design For Tidal Power Plant At Kuching Barrage
title_fullStr Development Of Preliminary Design For Tidal Power Plant At Kuching Barrage
title_full_unstemmed Development Of Preliminary Design For Tidal Power Plant At Kuching Barrage
title_sort development of preliminary design for tidal power plant at kuching barrage
publisher Universiti Malaysia Sarawak (UNIMAS)
publishDate 2018
url http://ir.unimas.my/id/eprint/33690/4/Norman%20Baggio.pdf
http://ir.unimas.my/id/eprint/33690/
_version_ 1797543475756924928
score 13.160551