Development Of Preliminary Design For Tidal Power Plant At Kuching Barrage
This Final Year Project report describes the necessities of tidal energy and operation of existing tidal power plants across the globe. There are thousands of operating tidal power plants in the world because tidal energy harnessing is one of the methods to overcome the issues of fossil fuels short...
Saved in:
Main Author: | |
---|---|
Format: | Final Year Project Report |
Language: | English |
Published: |
Universiti Malaysia Sarawak (UNIMAS)
2018
|
Subjects: | |
Online Access: | http://ir.unimas.my/id/eprint/33690/4/Norman%20Baggio.pdf http://ir.unimas.my/id/eprint/33690/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.unimas.ir.33690 |
---|---|
record_format |
eprints |
spelling |
my.unimas.ir.336902024-04-22T02:06:03Z http://ir.unimas.my/id/eprint/33690/ Development Of Preliminary Design For Tidal Power Plant At Kuching Barrage Norman Baggio, Francis TJ Mechanical engineering and machinery This Final Year Project report describes the necessities of tidal energy and operation of existing tidal power plants across the globe. There are thousands of operating tidal power plants in the world because tidal energy harnessing is one of the methods to overcome the issues of fossil fuels shortage. This report also introduces Kuching Barrage, a flood mitigation system located in Kuching, Sarawak. It has the potential to become a tidal power plant. There are plans and studies conducted by local researchers to convert the barrage from a flood mitigation system to a functional tidal power plant. However, the idea has never been approved by the government due to internal reasons. Therefore, this project is introduced in hopes that the government will eventually approve of the idea. There are four objectives in this project, which are to determine the mean tidal range and potential annual power output at Kuching Barrage, to select the best type of tidal turbine for the proposed tidal power plant, to study all the parameters of the selected turbine, as well as to perform a numerical analysis on the gate opening for varying tide levels. Based on the main findings, all the objectives are successfully achieved, although there is some undesired result. Hence, a recommendation is suggested to overcome the unexpected engineering hurdle. Universiti Malaysia Sarawak (UNIMAS) 2018 Final Year Project Report NonPeerReviewed text en http://ir.unimas.my/id/eprint/33690/4/Norman%20Baggio.pdf Norman Baggio, Francis (2018) Development Of Preliminary Design For Tidal Power Plant At Kuching Barrage. [Final Year Project Report] (Unpublished) |
institution |
Universiti Malaysia Sarawak |
building |
Centre for Academic Information Services (CAIS) |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Sarawak |
content_source |
UNIMAS Institutional Repository |
url_provider |
http://ir.unimas.my/ |
language |
English |
topic |
TJ Mechanical engineering and machinery |
spellingShingle |
TJ Mechanical engineering and machinery Norman Baggio, Francis Development Of Preliminary Design For Tidal Power Plant At Kuching Barrage |
description |
This Final Year Project report describes the necessities of tidal energy and operation of existing tidal power plants across the globe. There are thousands of operating
tidal power plants in the world because tidal energy harnessing is one of the methods to overcome the issues of fossil fuels shortage. This report also introduces Kuching Barrage, a flood mitigation system located in Kuching, Sarawak. It has the potential to become a
tidal power plant. There are plans and studies conducted by local researchers to convert the barrage from a flood mitigation system to a functional tidal power plant. However, the idea has never been approved by the government due to internal reasons. Therefore,
this project is introduced in hopes that the government will eventually approve of the idea. There are four objectives in this project, which are to determine the mean tidal range and potential annual power output at Kuching Barrage, to select the best type of tidal turbine
for the proposed tidal power plant, to study all the parameters of the selected turbine, as well as to perform a numerical analysis on the gate opening for varying tide levels. Based on the main findings, all the objectives are successfully achieved, although there is some
undesired result. Hence, a recommendation is suggested to overcome the unexpected engineering hurdle. |
format |
Final Year Project Report |
author |
Norman Baggio, Francis |
author_facet |
Norman Baggio, Francis |
author_sort |
Norman Baggio, Francis |
title |
Development Of Preliminary Design For Tidal Power Plant At Kuching Barrage |
title_short |
Development Of Preliminary Design For Tidal Power Plant At Kuching Barrage |
title_full |
Development Of Preliminary Design For Tidal Power Plant At Kuching Barrage |
title_fullStr |
Development Of Preliminary Design For Tidal Power Plant At Kuching Barrage |
title_full_unstemmed |
Development Of Preliminary Design For Tidal Power Plant At Kuching Barrage |
title_sort |
development of preliminary design for tidal power plant at kuching barrage |
publisher |
Universiti Malaysia Sarawak (UNIMAS) |
publishDate |
2018 |
url |
http://ir.unimas.my/id/eprint/33690/4/Norman%20Baggio.pdf http://ir.unimas.my/id/eprint/33690/ |
_version_ |
1797543475756924928 |
score |
13.160551 |