Relationship Performance of Cylindrical Detention Pond (CDP) as Depression Storage and Runoff Reduction Under Fully Saturated Condition

Permeable pavements are a key Storm water management measure employed both to attenuate surface runoff in urban areas and to filter urban storm water pollutants. Existing permeable pavements (PP) are design with the specific percentage porosity whereby enabling excess rainwater to infiltrate through...

Full description

Saved in:
Bibliographic Details
Main Authors: Maseri, H., Selaman, O. S., Mannan, M. A., Taib, S.N.L.
Format: Article
Language:English
Published: American Scientific Publishers 2020
Subjects:
Online Access:http://ir.unimas.my/id/eprint/31724/1/Relationship%20Performance%20of%20Cylindrical%20Detention%20Pond%20%28CDP%29%20as%20Depression%20Storage%20and%20Runoff%20Reduction%20Under%20Fully%20Saturated%20Condition.pdf
http://ir.unimas.my/id/eprint/31724/
https://www.ingentaconnect.com/content/asp/jctn/2020/00000017/00000002/art00136;jsessionid=bi5okatrikk7r.x-ic-live-02
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.unimas.ir.31724
record_format eprints
spelling my.unimas.ir.317242020-09-11T03:10:35Z http://ir.unimas.my/id/eprint/31724/ Relationship Performance of Cylindrical Detention Pond (CDP) as Depression Storage and Runoff Reduction Under Fully Saturated Condition Maseri, H. Selaman, O. S. Mannan, M. A. Taib, S.N.L. TA Engineering (General). Civil engineering (General) Permeable pavements are a key Storm water management measure employed both to attenuate surface runoff in urban areas and to filter urban storm water pollutants. Existing permeable pavements (PP) are design with the specific percentage porosity whereby enabling excess rainwater to infiltrate through the system and acting as a depression storage at the same time. Depression storage basically refers to the volume of water trapped in the depression when the precipitation of a storm reaches the ground and filled up all the depression before it can flow over the surface. Cylindrical Detention Pond (CDP) is an alternative paving material that may alleviate many of the hydrological problems caused by urban runoff from developed areas. CDP consist of three basic component; top cover, bottom cover and hollow cylindrical at centre (300 mm thickness). The hollow cylindrical has approximate 50 percent porosity from the total solid of component, which is every 1 inch (25 mm) of pavement depth can hold 0.5 inches (12.5 mm) of rain in theoretical. In this study, the depression storage rate of CDP was investigated under three different rainfall intensity scenarios which are 77 mm/hr (low), 153 mm/hr (medium), and 230 mm/hr (heavy) respectively whereby it function to monitoring the analytical trend line. The experiment was conducted in model box in the laboratory under fully saturated condition. It found that the CDP can performed to detent the water until 180 min of excess rainfall for all 2 year ARI, 5 year ARI, 10 year ARI, 20 year ARI, 50 year ARI and 100 year ARI with different rates. CDP’s able to reduce the runoff up to 77% of the total rainfall volume. The result was proved the hollow cylindrical at centre of CDP very effective in runoff volume reduction according to the different ARI trend line projection. American Scientific Publishers 2020-02 Article PeerReviewed text en http://ir.unimas.my/id/eprint/31724/1/Relationship%20Performance%20of%20Cylindrical%20Detention%20Pond%20%28CDP%29%20as%20Depression%20Storage%20and%20Runoff%20Reduction%20Under%20Fully%20Saturated%20Condition.pdf Maseri, H. and Selaman, O. S. and Mannan, M. A. and Taib, S.N.L. (2020) Relationship Performance of Cylindrical Detention Pond (CDP) as Depression Storage and Runoff Reduction Under Fully Saturated Condition. Journal of Computational and Theoretical Nanoscience, 17 (2-3). pp. 1539-1546. https://www.ingentaconnect.com/content/asp/jctn/2020/00000017/00000002/art00136;jsessionid=bi5okatrikk7r.x-ic-live-02 10.1166/jctn.2020.8837
institution Universiti Malaysia Sarawak
building Centre for Academic Information Services (CAIS)
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Sarawak
content_source UNIMAS Institutional Repository
url_provider http://ir.unimas.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Maseri, H.
Selaman, O. S.
Mannan, M. A.
Taib, S.N.L.
Relationship Performance of Cylindrical Detention Pond (CDP) as Depression Storage and Runoff Reduction Under Fully Saturated Condition
description Permeable pavements are a key Storm water management measure employed both to attenuate surface runoff in urban areas and to filter urban storm water pollutants. Existing permeable pavements (PP) are design with the specific percentage porosity whereby enabling excess rainwater to infiltrate through the system and acting as a depression storage at the same time. Depression storage basically refers to the volume of water trapped in the depression when the precipitation of a storm reaches the ground and filled up all the depression before it can flow over the surface. Cylindrical Detention Pond (CDP) is an alternative paving material that may alleviate many of the hydrological problems caused by urban runoff from developed areas. CDP consist of three basic component; top cover, bottom cover and hollow cylindrical at centre (300 mm thickness). The hollow cylindrical has approximate 50 percent porosity from the total solid of component, which is every 1 inch (25 mm) of pavement depth can hold 0.5 inches (12.5 mm) of rain in theoretical. In this study, the depression storage rate of CDP was investigated under three different rainfall intensity scenarios which are 77 mm/hr (low), 153 mm/hr (medium), and 230 mm/hr (heavy) respectively whereby it function to monitoring the analytical trend line. The experiment was conducted in model box in the laboratory under fully saturated condition. It found that the CDP can performed to detent the water until 180 min of excess rainfall for all 2 year ARI, 5 year ARI, 10 year ARI, 20 year ARI, 50 year ARI and 100 year ARI with different rates. CDP’s able to reduce the runoff up to 77% of the total rainfall volume. The result was proved the hollow cylindrical at centre of CDP very effective in runoff volume reduction according to the different ARI trend line projection.
format Article
author Maseri, H.
Selaman, O. S.
Mannan, M. A.
Taib, S.N.L.
author_facet Maseri, H.
Selaman, O. S.
Mannan, M. A.
Taib, S.N.L.
author_sort Maseri, H.
title Relationship Performance of Cylindrical Detention Pond (CDP) as Depression Storage and Runoff Reduction Under Fully Saturated Condition
title_short Relationship Performance of Cylindrical Detention Pond (CDP) as Depression Storage and Runoff Reduction Under Fully Saturated Condition
title_full Relationship Performance of Cylindrical Detention Pond (CDP) as Depression Storage and Runoff Reduction Under Fully Saturated Condition
title_fullStr Relationship Performance of Cylindrical Detention Pond (CDP) as Depression Storage and Runoff Reduction Under Fully Saturated Condition
title_full_unstemmed Relationship Performance of Cylindrical Detention Pond (CDP) as Depression Storage and Runoff Reduction Under Fully Saturated Condition
title_sort relationship performance of cylindrical detention pond (cdp) as depression storage and runoff reduction under fully saturated condition
publisher American Scientific Publishers
publishDate 2020
url http://ir.unimas.my/id/eprint/31724/1/Relationship%20Performance%20of%20Cylindrical%20Detention%20Pond%20%28CDP%29%20as%20Depression%20Storage%20and%20Runoff%20Reduction%20Under%20Fully%20Saturated%20Condition.pdf
http://ir.unimas.my/id/eprint/31724/
https://www.ingentaconnect.com/content/asp/jctn/2020/00000017/00000002/art00136;jsessionid=bi5okatrikk7r.x-ic-live-02
_version_ 1677785554958155776
score 13.15806