Comparative study of structural steeland reinforced concrete method : a project management case study
Structural steel construction has been quite common construction method in the world. In other developed countries such as Japan, structural steel is considered as a norm and is frequently opted for in construction. However, in Malaysia, steel construction is one of the construction methods, which...
Saved in:
Main Author: | |
---|---|
Format: | Final Year Project Report |
Language: | English English |
Published: |
Universiti Malaysia Sarawak (UNIMAS)
2004
|
Subjects: | |
Online Access: | http://ir.unimas.my/id/eprint/25757/1/Hu%20Wei%20Kiet.pdf http://ir.unimas.my/id/eprint/25757/4/Hu%20Wei%20Kiet%20-%20full.pdf http://ir.unimas.my/id/eprint/25757/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.unimas.ir.25757 |
---|---|
record_format |
eprints |
spelling |
my.unimas.ir.257572023-11-27T04:00:19Z http://ir.unimas.my/id/eprint/25757/ Comparative study of structural steeland reinforced concrete method : a project management case study Hu, Wei Kiet. TA Engineering (General). Civil engineering (General) Structural steel construction has been quite common construction method in the world. In other developed countries such as Japan, structural steel is considered as a norm and is frequently opted for in construction. However, in Malaysia, steel construction is one of the construction methods, which is yet to be as popular. Many of our traditional construction methods such as reinforced concrete construction are still greatly favoured by our construction industry. One of the common comment of the usage of structural steel in construction is it is a more expensive option if compared to RC construction. It is the aim of this research study to carry out a comparative study between structural steel construction method with one type of traditional construction method (RC construction is chosen here). Comparison will be made with 3 principle project management criteria for a successful project, i.e. time, cost and quality. Through this case study on these two type of construction methods, the advantages and weaknesses of stee1 construction can be reviewed. It was found that material cost for the structural steel construction method is indeed more expensive than the RC construction method and this is because focus is on the material cost only and other perspectives such as quality; time savings and cost savings, which may result; are generally ignored. From this study, it is hope that structural steel usage can be strengthened and other aspects such as time savings and quality can be taken into more serious consideration by all parties in the industry when choosing construction method to adopt. And hopefully, structural steel can be as good as option if not a better one compared to R.C construction. Universiti Malaysia Sarawak (UNIMAS) 2004 Final Year Project Report NonPeerReviewed text en http://ir.unimas.my/id/eprint/25757/1/Hu%20Wei%20Kiet.pdf text en http://ir.unimas.my/id/eprint/25757/4/Hu%20Wei%20Kiet%20-%20full.pdf Hu, Wei Kiet. (2004) Comparative study of structural steeland reinforced concrete method : a project management case study. [Final Year Project Report] (Unpublished) |
institution |
Universiti Malaysia Sarawak |
building |
Centre for Academic Information Services (CAIS) |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Sarawak |
content_source |
UNIMAS Institutional Repository |
url_provider |
http://ir.unimas.my/ |
language |
English English |
topic |
TA Engineering (General). Civil engineering (General) |
spellingShingle |
TA Engineering (General). Civil engineering (General) Hu, Wei Kiet. Comparative study of structural steeland reinforced concrete method : a project management case study |
description |
Structural steel construction has been quite common construction method in the world. In other developed countries such as Japan, structural steel is considered as a norm and is frequently opted for in construction. However, in Malaysia, steel construction is one of the
construction methods, which is yet to be as popular. Many of our traditional construction methods such as reinforced concrete construction are still greatly favoured by our construction industry. One of the common comment of the usage of structural steel in construction is it is a more expensive option if compared to RC construction. It is the aim of this research study to
carry out a comparative study between structural steel construction method with one type of traditional construction method (RC construction is chosen here). Comparison will be made with 3 principle project management criteria for a successful project, i.e. time, cost and quality. Through this case study on these two type of construction methods, the advantages
and weaknesses of stee1 construction can be reviewed. It was found that material cost for the structural steel construction method is indeed more expensive than the RC construction method and this is because focus is on the material cost only and other perspectives such as
quality; time savings and cost savings, which may result; are generally ignored. From this study, it is hope that structural steel usage can be strengthened and other aspects such as time savings and quality can be taken into more serious consideration by all parties in the industry when choosing construction method to adopt. And hopefully, structural steel can be as good as option if not a better one compared to R.C construction. |
format |
Final Year Project Report |
author |
Hu, Wei Kiet. |
author_facet |
Hu, Wei Kiet. |
author_sort |
Hu, Wei Kiet. |
title |
Comparative study of structural steeland reinforced concrete method : a project management case study |
title_short |
Comparative study of structural steeland reinforced concrete method : a project management case study |
title_full |
Comparative study of structural steeland reinforced concrete method : a project management case study |
title_fullStr |
Comparative study of structural steeland reinforced concrete method : a project management case study |
title_full_unstemmed |
Comparative study of structural steeland reinforced concrete method : a project management case study |
title_sort |
comparative study of structural steeland reinforced concrete method : a project management case study |
publisher |
Universiti Malaysia Sarawak (UNIMAS) |
publishDate |
2004 |
url |
http://ir.unimas.my/id/eprint/25757/1/Hu%20Wei%20Kiet.pdf http://ir.unimas.my/id/eprint/25757/4/Hu%20Wei%20Kiet%20-%20full.pdf http://ir.unimas.my/id/eprint/25757/ |
_version_ |
1783883509877702656 |
score |
13.214268 |