Lian Seng quarry operations at km 19 Penampang - Tambunan Road, Sabah, Malaysia : Environmental Impact Assessment
Saved in:
Main Author: | Otentik Sdn. Bhd. Tawau, Sabah, - |
---|---|
Format: | Report |
Language: | English |
Published: |
Otentik Sdn. Bhd. Tawau, Sabah
1994
|
Subjects: | |
Online Access: | http://ir.unimas.my/id/eprint/24029/1/Lian%20Seng%20Quatty%20Operations%20at%20KM%2019%20Penampang%20%E2%80%93%20Tambunan%20Road%2C%20Sabah%2C....pdf http://ir.unimas.my/id/eprint/24029/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Bukit Kukusan Quarry Operations Tawau, Sabah Malaysia
by: Universiti Kebangsaan Malaysia Kampus Sabah
Published: (2018) -
Engineering Geological Assessment (EGA) on Slopes Along The Penampang to Tambunan Road, Sabah, Malaysia.
by: Rodeano Roslee, et al.
Published: (2018) -
Sungai Sarawak Environmental Control And River Management Study
by: KTA (Sarawak) Sdn Bhd, -, et al.
Published: (1996) -
Environmental Impact Assessment Permanent Campus Universiti Malaysia Sarawak Kota Sarawak
by: Perunding GEA (m) Sdn Bhd, -
Published: (1995) -
Major road projects and undersea tunnel in Penang
by: Consortium Zenith BUCG Sdn Bhd
Published: (2013)