Forest Clearcutting and Site Preparation On A Saline Soil In East Texas: Impacts On Water Quality

Three 0.02 hectare plot-watersheds were installed on a saline soil in the Davy Crockett National Forest near Apple Springs, Texas. Each plot was installed with an H-flume, FW-1 automatic water level recorder, Coshocton N-1 runoff sampler, and two storage tanks. One watershed was undisturbed forested...

Full description

Saved in:
Bibliographic Details
Main Authors: McBroom, Matthew W., Mingteh, Chang, Alexander Kiew, Sayok
Format: Article
Language:English
Published: Miscellaneous Publication 2002
Subjects:
Online Access:http://ir.unimas.my/id/eprint/16160/1/FOREST%20CLEARCUTTING%20%28abstract%29.pdf
http://ir.unimas.my/id/eprint/16160/
https://www.researchgate.net/publication/242617073
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.unimas.ir.16160
record_format eprints
spelling my.unimas.ir.161602023-08-29T02:48:42Z http://ir.unimas.my/id/eprint/16160/ Forest Clearcutting and Site Preparation On A Saline Soil In East Texas: Impacts On Water Quality McBroom, Matthew W. Mingteh, Chang Alexander Kiew, Sayok GE Environmental Sciences Three 0.02 hectare plot-watersheds were installed on a saline soil in the Davy Crockett National Forest near Apple Springs, Texas. Each plot was installed with an H-flume, FW-1 automatic water level recorder, Coshocton N-1 runoff sampler, and two storage tanks. One watershed was undisturbed forested and served a control, one was clearcut without any site-preparation, and the third was clearcut, V-blade sheared, windrowed, and vegetation regrowth was prevented for the first 2 years. A total of 274 storms were recorded during the four-year study period, 1989-1992. Average annual sediment losses for the study period were 55, 197, and 1,530 kilograms per hectare per year for the control, commercial clearcut, and sheared plots, respectively. These losses are about average for most studies conducted in East Texas and the Southeast and are well below average losses for all land uses in the Southeast. Sediment losses and surface runoff were significantly greater from the sheared plot-watershed than from the control and the commercial clearcut plots. Employing Wischmeier and Smith’s (1978) long-term average R-value for the USLE overestimated annual sediment yield for the study period, while two shortcut models developed in the United States resulted in more accurate predictions and are good substitutes for the long-term R-value. Total losses in surface runoff of PO4, NO3, NO2, TKN, K, Ca, Mg, Na, Al, Fe, Zn, and Cu were higher on the site-prepared plot watershed than the other two. Losses of PO4, TKN, and NO2 were higher on the commercial clearcut plot than the control. Losses were not high enough to adversely affect forest productivity. Concentrations of elements were generally below established USEPA surface water quality standards and were not high enough to adversely affect plant growth. Miscellaneous Publication 2002 Article PeerReviewed text en http://ir.unimas.my/id/eprint/16160/1/FOREST%20CLEARCUTTING%20%28abstract%29.pdf McBroom, Matthew W. and Mingteh, Chang and Alexander Kiew, Sayok (2002) Forest Clearcutting and Site Preparation On A Saline Soil In East Texas: Impacts On Water Quality. Gen. Tech. Rep. SRS-48. Asheville, NC: U.S. Department of Agriculture, Forest Service, Southern Research Station. pp. 535-542. ISSN ISBN: 9780975746928 https://www.researchgate.net/publication/242617073
institution Universiti Malaysia Sarawak
building Centre for Academic Information Services (CAIS)
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Sarawak
content_source UNIMAS Institutional Repository
url_provider http://ir.unimas.my/
language English
topic GE Environmental Sciences
spellingShingle GE Environmental Sciences
McBroom, Matthew W.
Mingteh, Chang
Alexander Kiew, Sayok
Forest Clearcutting and Site Preparation On A Saline Soil In East Texas: Impacts On Water Quality
description Three 0.02 hectare plot-watersheds were installed on a saline soil in the Davy Crockett National Forest near Apple Springs, Texas. Each plot was installed with an H-flume, FW-1 automatic water level recorder, Coshocton N-1 runoff sampler, and two storage tanks. One watershed was undisturbed forested and served a control, one was clearcut without any site-preparation, and the third was clearcut, V-blade sheared, windrowed, and vegetation regrowth was prevented for the first 2 years. A total of 274 storms were recorded during the four-year study period, 1989-1992. Average annual sediment losses for the study period were 55, 197, and 1,530 kilograms per hectare per year for the control, commercial clearcut, and sheared plots, respectively. These losses are about average for most studies conducted in East Texas and the Southeast and are well below average losses for all land uses in the Southeast. Sediment losses and surface runoff were significantly greater from the sheared plot-watershed than from the control and the commercial clearcut plots. Employing Wischmeier and Smith’s (1978) long-term average R-value for the USLE overestimated annual sediment yield for the study period, while two shortcut models developed in the United States resulted in more accurate predictions and are good substitutes for the long-term R-value. Total losses in surface runoff of PO4, NO3, NO2, TKN, K, Ca, Mg, Na, Al, Fe, Zn, and Cu were higher on the site-prepared plot watershed than the other two. Losses of PO4, TKN, and NO2 were higher on the commercial clearcut plot than the control. Losses were not high enough to adversely affect forest productivity. Concentrations of elements were generally below established USEPA surface water quality standards and were not high enough to adversely affect plant growth.
format Article
author McBroom, Matthew W.
Mingteh, Chang
Alexander Kiew, Sayok
author_facet McBroom, Matthew W.
Mingteh, Chang
Alexander Kiew, Sayok
author_sort McBroom, Matthew W.
title Forest Clearcutting and Site Preparation On A Saline Soil In East Texas: Impacts On Water Quality
title_short Forest Clearcutting and Site Preparation On A Saline Soil In East Texas: Impacts On Water Quality
title_full Forest Clearcutting and Site Preparation On A Saline Soil In East Texas: Impacts On Water Quality
title_fullStr Forest Clearcutting and Site Preparation On A Saline Soil In East Texas: Impacts On Water Quality
title_full_unstemmed Forest Clearcutting and Site Preparation On A Saline Soil In East Texas: Impacts On Water Quality
title_sort forest clearcutting and site preparation on a saline soil in east texas: impacts on water quality
publisher Miscellaneous Publication
publishDate 2002
url http://ir.unimas.my/id/eprint/16160/1/FOREST%20CLEARCUTTING%20%28abstract%29.pdf
http://ir.unimas.my/id/eprint/16160/
https://www.researchgate.net/publication/242617073
_version_ 1775627200748322816
score 13.214268