A review of the centralized sewerage system for Kuching City

The centralized sewerage system for Kuching City curently under construction and this project is expected to be completed by october 2012. This system shall collect all the wastewater through sewer network to a centralized treatment plant and using yhe activated sludge system to treat the wastewate...

Full description

Saved in:
Bibliographic Details
Main Author: Christina, Umpi.
Format: Thesis
Language:English
Published: Universiti Malaysia Sarawak, (UNIMAS) 2012
Subjects:
Online Access:http://ir.unimas.my/id/eprint/14132/1/Christina%20Umpi%20ft.pdf
http://ir.unimas.my/id/eprint/14132/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The centralized sewerage system for Kuching City curently under construction and this project is expected to be completed by october 2012. This system shall collect all the wastewater through sewer network to a centralized treatment plant and using yhe activated sludge system to treat the wastewater. The effluent after being discharged into a constructed wetland before finally flowing into Sarawak River is believed to comply with a Standard A of the enviroment Quality Act requirement. Prior to this, Sarawak river and its tributaries within the study area are polluted. The main source of the pollution is raw and insufficiently treated sewage and wastewater, which is eventually drained to Sarawak River.