Delay in large MARA construction projects based on project management consultant perspective
MUCEET 2009 is organized by Malaysian Technical Universities Network (MTUN) comprising of Universiti Malaysia Perlis (UniMAP), Universiti Tun Hussein Onn (UTHM), Universiti Teknikal Melaka (UTeM) and Universiti Malaysia Pahang (UMP), 20th - 22nd June 2009 at M. S. Garden Hotel, Kuantan, Pahang.
Saved in:
Main Authors: | Mohd Razaki, Abdullah, Ismail, Abd Rahman, Adi Asmi, Abd Azis |
---|---|
Other Authors: | abdullahrazaki@yahoo.com |
Format: | Working Paper |
Language: | English |
Published: |
Universiti Malaysia Pahang (UMP)
2010
|
Subjects: | |
Online Access: | http://dspace.unimap.edu.my/xmlui/handle/123456789/8519 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The effect of modified UNBabc mapping function on the improvement of Global Positioning System tropospheric delay
by: Hamzah, Sakidin, et al.
Published: (2010) -
Recurring Project Overrun and Project Management Problems in Engineering and Construction Industries
by: Lim, Cheong Seng
Published: (2001) -
Case study: Investigating factors contributed to failure of project delivery within stipulated contract time
by: Ahmad Harith Bin Ishak
Published: (2023) -
Lack of awareness among contractor in project management: delay construction / Suria Yaacob
by: Yaacob, Suria
Published: (2006) -
Large infrastructure projects - Potential overseas
by: Anon
Published: (2011)