Cycle time variation analysis on shop floor production line – a case study in medical device manufacturing industry

Access is limited to UniMAP community.

Saved in:
Bibliographic Details
Main Author: Agilan, Subramaniam
Other Authors: Rosmaini, Ahmad, Dr.
Format: Learning Object
Language:English
Published: Universiti Malaysia Perlis (UniMAP) 2021
Subjects:
Online Access:http://dspace.unimap.edu.my:80/xmlui/handle/123456789/69894
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.unimap-69894
record_format dspace
spelling my.unimap-698942021-02-25T03:31:36Z Cycle time variation analysis on shop floor production line – a case study in medical device manufacturing industry Agilan, Subramaniam Rosmaini, Ahmad, Dr. Cycle time variation Cycle time variation -- Analysis Access is limited to UniMAP community. This is a case study of cycle time of machines and production lines of a medical device manufacturing plant. Unstable cycle times leads to unreliable production operation which in turn reduces productivity. More time, energy and money is wasted in non-value added activities. Therefore this research is done to establish strategies to improve cycle production rate of target facility. Cycle time data taken was recorded and analyzed to identify patterns. As a starting point, this report survey a few past journal to investigate the history of the cycle time study, and what kind of issues are encountered and the methods of troubleshooting. From the journal review, related parameters and guidelines are presented and summarized alongside with factors affecting those parameters. Further investigation of bottlenecks revealed the causes of both CT variation and bottlenecks. Solutions are drawn up to effectively reduce cycle time variation and eliminate bottlenecks. Proposed strategies are then used to determine improved cycle times of production lines. Percentage of improvement is then calculated to determine the success rate of solution and to compare current cycle time and improved cycle time in terms of potential of development and efficiency. Based on the procured results, the production line improvement strategies have significant positive effects on production lines. 2021-02-25T03:31:36Z 2021-02-25T03:31:36Z 2016-06 Learning Object http://dspace.unimap.edu.my:80/xmlui/handle/123456789/69894 en Universiti Malaysia Perlis (UniMAP)
institution Universiti Malaysia Perlis
building UniMAP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Perlis
content_source UniMAP Library Digital Repository
url_provider http://dspace.unimap.edu.my/
language English
topic Cycle time variation
Cycle time variation -- Analysis
spellingShingle Cycle time variation
Cycle time variation -- Analysis
Agilan, Subramaniam
Cycle time variation analysis on shop floor production line – a case study in medical device manufacturing industry
description Access is limited to UniMAP community.
author2 Rosmaini, Ahmad, Dr.
author_facet Rosmaini, Ahmad, Dr.
Agilan, Subramaniam
format Learning Object
author Agilan, Subramaniam
author_sort Agilan, Subramaniam
title Cycle time variation analysis on shop floor production line – a case study in medical device manufacturing industry
title_short Cycle time variation analysis on shop floor production line – a case study in medical device manufacturing industry
title_full Cycle time variation analysis on shop floor production line – a case study in medical device manufacturing industry
title_fullStr Cycle time variation analysis on shop floor production line – a case study in medical device manufacturing industry
title_full_unstemmed Cycle time variation analysis on shop floor production line – a case study in medical device manufacturing industry
title_sort cycle time variation analysis on shop floor production line – a case study in medical device manufacturing industry
publisher Universiti Malaysia Perlis (UniMAP)
publishDate 2021
url http://dspace.unimap.edu.my:80/xmlui/handle/123456789/69894
_version_ 1698698272791592960
score 13.214268