Technical visit to KVMRT Line 2 - V207 mined tunnel site
Link to publisher’s homepage at https://www.myiem.org.my/
Saved in:
Main Author: | Rini Asnida, Abdullah, Ir. Dr. |
---|---|
Format: | Article |
Language: | English |
Published: |
The Institution of Engineers, Malaysia (IEM)
2019
|
Subjects: | |
Online Access: | http://dspace.unimap.edu.my:80/xmlui/handle/123456789/62353 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Technical site visit to Sungai Besi tunnel
by: Koong, Chong Chi, Ir.
Published: (2019) -
Tunnel boring and other underground works of the KVMRT SBK line
by: Min, Khoo Chee, Ir.
Published: (2015) -
Localising tunnelling talent
by: Syed Rajah, Hussain, Ir., et al.
Published: (2017) -
Segmental tunnel lining design- understanding ground-Tunnel interactions in staggered tunnel lining
by: Siti Norafida, Jusoh, Dr.
Published: (2018) -
Technical visit to pipe roofing system at Maluri Station
by: Cheah, Frankie, Ir.
Published: (2016)