Kerja infrastruktur HSR RM40b
Saved in:
Main Author: | Nur Hanani, Azman |
---|---|
Other Authors: | ekonomi@utusan.com.my |
Format: | Other |
Language: | other |
Published: |
Utusan Malaysia
2018
|
Subjects: | |
Online Access: | http://dspace.unimap.edu.my:80/xmlui/handle/123456789/56558 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
HSR guna 40 peratus komponen tempatun
by: Mohd Azrone, Sarabatin
Published: (2018) -
HSR ubah gaya hidup,ekonomi dua negara
by: Che Wan Badrul, Alias, et al.
Published: (2018) -
HSR : Malaysia jadi hab ekonomi ASEAN
by: Fadzil, Zainol
Published: (2017) -
Projek HSR wajar dipertimbang semula
by: Rohaniza, Idris
Published: (2018) -
Lokasi stesen kereta api laju KL-Singapura kurang strategik
by: Ahmad Suhael, Adnan
Published: (2018)