Semi-batch operated constructed wetlands planted with Phragmites australis for treatment of dyeing wastewater
Link to publisher's homepage at http://jestec.taylors.edu.my/
Saved in:
Main Authors: | Ong, Soon-An, Ho, Li Ngee, Wong, Yee Shian, Danny Leonard, Dugil, Hafizah, Samad |
---|---|
Other Authors: | yswong@unimap.edu.my |
Format: | Article |
Language: | English |
Published: |
Taylor's University College
2016
|
Subjects: | |
Online Access: | http://dspace.unimap.edu.my:80/xmlui/handle/123456789/42198 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Mineralization of diazo dye (Reactive Black 5) in wastewater using recirculated up-flow constructed wetland reactor
by: Ong, Soon An, Dr., et al.
Published: (2013) -
Artificial aeration to enhance the mineralization of mono azo (methyl orange)-containing wastewater using recirculated up-flow constructed wetland
by: Ong, Soon-An, et al.
Published: (2016) -
Phytoremediation of azo dye containing wastewater by using up-flow constructed wetlands
by: Danny, Leonard Dugil
Published: (2012) -
Phytoremediation of industrial effluent containing azo dye by model up-flow constructed wetland
by: Ong, Soon An, et al.
Published: (2016) -
Performance evaluation of laboratory scale up-flow constructed wetlands with different designs and emergent plants.
by: Soon-An, Ong, et al.
Published: (2011)