Pre-Commisioning of UniMAP 1.0 MW Rooftop Solar Photovoltaic
Projek 1.0 MW Solar Photovoltaic Kampus UniMAP merupakan sebuah projek usahasama di antara UniMAP, UniMAP Holdings Sdn. Bhd. (UniMAPHSB) dan Getsol Sdn. Bhd. (Getsol). Satu memorandum persefahaman telah ditandatangani bersama UniMAP, UniMAPHSB dan Getsol pad a 18 Jun 2013 di Kampus Pauh Putra. R...
Saved in:
Main Author: | Anon |
---|---|
Format: | Other |
Language: | other |
Published: |
Universiti Malaysia Perlis (UniMAP)
2016
|
Subjects: | |
Online Access: | http://dspace.unimap.edu.my:80/xmlui/handle/123456789/41228 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
UniMAP universiti awam pertama miliki panel solar 1.0 MW
by: Anon
Published: (2016) -
Speech By Brig. Jen. Dato' Prof. Dr. Kamarudin Hussin at the Memorandum of Agreement (MoA) Signing Ceremony between UniMAP, GETSOL and UniMAP Holdings (The RE Project - Rooftop Solar Panel for FIT (Feed-in-tariff)
by: Kamarudin, Hussin, Brig. Jen. Dato' Prof. Dr.
Published: (2015) -
Lightning performance analysis of a rooftop grid- connected solar photovoltaic without external lightning protection system
by: Mohd Nasir, Mohd Solehin
Published: (2018) -
Developing a spreasheet - based simulator for solar usage rooftop installation assessment ( SURIA)
by: Muhammad Aqil Afham Bin Rahmat
Published: (2023) -
A numerical study on photovoltaic cell performance at high temperature
by: Abdulkareem, Naser Mahmood
Published: (2016)