Practicing lean in sustainable construction to achieve time reduction
Link to publisher's homepage at http://ijbt.unimap.edu.my/
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Article |
Language: | English |
Published: |
School of Business Innovation and Technopreneurship, Universiti Malaysia Perlis (UniMAP)
2015
|
Subjects: | |
Online Access: | http://dspace.unimap.edu.my:80/xmlui/handle/123456789/40023 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.unimap-40023 |
---|---|
record_format |
dspace |
spelling |
my.unimap-400232016-07-21T02:14:25Z Practicing lean in sustainable construction to achieve time reduction Muhamad Azani, Yahya Mohammed Alias, Yusof azani@upnm.edu.my alias@upnm.edu.my Lean Rapid construction Construction flow Construction innovation Link to publisher's homepage at http://ijbt.unimap.edu.my/ Implementing new management philosophy in construction became an approach for construction players in achieving optimum output of the process. The practice of eliminating non-value added in the construction process flow is important in creating the elements of time reduction. Therefore, lean is the best approach as a management philosophy to be adopted in construction process flow because of the stabilizing and pulling factors towards construction time reduction. There are few cases being observed and non-value added activities being analysed accordingly to lean approach. From the questionnaire survey, factors of waiting, overproduction and double handling became the most prolongation of the construction time that contributes to delay. The analysis proof that leans has the factor of time reduction and contributes to rapid construction. The construction process flow became stable and the minimum cost being pulled in the construction cycle. 2015-05-28T04:28:29Z 2015-05-28T04:28:29Z 2015-02 Article International Journal of Business and Technopreneurship, vol.5(1), 2015, pages 39-48 2231-7090 http://ijbt.unimap.edu.my/ http://dspace.unimap.edu.my:80/xmlui/handle/123456789/40023 en School of Business Innovation and Technopreneurship, Universiti Malaysia Perlis (UniMAP) |
institution |
Universiti Malaysia Perlis |
building |
UniMAP Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Perlis |
content_source |
UniMAP Library Digital Repository |
url_provider |
http://dspace.unimap.edu.my/ |
language |
English |
topic |
Lean Rapid construction Construction flow Construction innovation |
spellingShingle |
Lean Rapid construction Construction flow Construction innovation Muhamad Azani, Yahya Mohammed Alias, Yusof Practicing lean in sustainable construction to achieve time reduction |
description |
Link to publisher's homepage at http://ijbt.unimap.edu.my/ |
author2 |
azani@upnm.edu.my |
author_facet |
azani@upnm.edu.my Muhamad Azani, Yahya Mohammed Alias, Yusof |
format |
Article |
author |
Muhamad Azani, Yahya Mohammed Alias, Yusof |
author_sort |
Muhamad Azani, Yahya |
title |
Practicing lean in sustainable construction to achieve time reduction |
title_short |
Practicing lean in sustainable construction to achieve time reduction |
title_full |
Practicing lean in sustainable construction to achieve time reduction |
title_fullStr |
Practicing lean in sustainable construction to achieve time reduction |
title_full_unstemmed |
Practicing lean in sustainable construction to achieve time reduction |
title_sort |
practicing lean in sustainable construction to achieve time reduction |
publisher |
School of Business Innovation and Technopreneurship, Universiti Malaysia Perlis (UniMAP) |
publishDate |
2015 |
url |
http://dspace.unimap.edu.my:80/xmlui/handle/123456789/40023 |
_version_ |
1643799239633928192 |
score |
13.222552 |