Production line: Effect of different inspection station allocation
Malaysian Technical Universities Conference on Engineering and Technology (MUCET) 2012 organised by technical universities under the Malaysian Technical Universities Network (MTUN), 20th - 21st November 2012 at Hotel Seri Malaysia, Kangar, Perlis.
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Working Paper |
Language: | English |
Published: |
Malaysian Technical Universities Network (MTUN)
2013
|
Subjects: | |
Online Access: | http://dspace.unimap.edu.my/xmlui/handle/123456789/27359 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.unimap-27359 |
---|---|
record_format |
dspace |
spelling |
my.unimap-273592013-08-05T00:53:44Z Production line: Effect of different inspection station allocation Umol Syamsyul, Rakiman Abdul Talib, Bon, Prof. Dr. serapohkampungku@yahoo.com.my talibon@gmail.com Production line ProModel Inspection Malaysian Technical Universities Conference on Engineering and Technology (MUCET) 2012 organised by technical universities under the Malaysian Technical Universities Network (MTUN), 20th - 21st November 2012 at Hotel Seri Malaysia, Kangar, Perlis. This paper intend to analyze a new production line in a metal stamping company based on the complain from the company and try to explore the better layout or arrangement in the production line in reflect to the complained problem and constrain of the provided of accept the defect and repair inspection policy. The production line is first being analyzed in response to complain through computer simulation. After the problem had been identified, the researcher tried different alternatives in the attempt to seek for the better layout or arrangement in the production line in regard of the inspection station allocation. The effect of different inspection station allocation layout is then being evaluated in term of the production time. After reducing the number of inspection station, interesting enough, the production time does not seem to decrease but increased. This finding contradicts the conventional thought of fewer stations means shorter time. This finding could be the founding basic in the future research regarding the allocation of the inspection station following certain provided policy. This is also very helpful in real life practice in company as to help them improve their production time. 2013-08-05T00:53:44Z 2013-08-05T00:53:44Z 2012-11-20 Working Paper p. 189-194 http://hdl.handle.net/123456789/27359 en Proceeding of the Malaysian Technical Universities Conference on Engineering and Technology (MUCET) 2012 Malaysian Technical Universities Network (MTUN) |
institution |
Universiti Malaysia Perlis |
building |
UniMAP Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Perlis |
content_source |
UniMAP Library Digital Repository |
url_provider |
http://dspace.unimap.edu.my/ |
language |
English |
topic |
Production line ProModel Inspection |
spellingShingle |
Production line ProModel Inspection Umol Syamsyul, Rakiman Abdul Talib, Bon, Prof. Dr. Production line: Effect of different inspection station allocation |
description |
Malaysian Technical Universities Conference on Engineering and Technology (MUCET) 2012 organised by technical universities under the Malaysian Technical Universities Network (MTUN), 20th - 21st November 2012 at Hotel Seri Malaysia, Kangar, Perlis. |
author2 |
serapohkampungku@yahoo.com.my |
author_facet |
serapohkampungku@yahoo.com.my Umol Syamsyul, Rakiman Abdul Talib, Bon, Prof. Dr. |
format |
Working Paper |
author |
Umol Syamsyul, Rakiman Abdul Talib, Bon, Prof. Dr. |
author_sort |
Umol Syamsyul, Rakiman |
title |
Production line: Effect of different inspection station allocation |
title_short |
Production line: Effect of different inspection station allocation |
title_full |
Production line: Effect of different inspection station allocation |
title_fullStr |
Production line: Effect of different inspection station allocation |
title_full_unstemmed |
Production line: Effect of different inspection station allocation |
title_sort |
production line: effect of different inspection station allocation |
publisher |
Malaysian Technical Universities Network (MTUN) |
publishDate |
2013 |
url |
http://dspace.unimap.edu.my/xmlui/handle/123456789/27359 |
_version_ |
1643795235357065216 |
score |
13.219503 |