An improvement study of outgoing materials handling at Perodua Engine Manufacturing Sdn. Bhd. (PEMSB) Plant in Sg Choh Rawang, Selangor

Access is limited to UniMAP community.

Saved in:
Bibliographic Details
Main Author: Mohd Fauzi, Mohd Noh
Other Authors: Mohd Shuid Salleh, Assoc. Prof.
Format: Learning Object
Language:English
Published: Universiti Malaysia Perlis 2013
Subjects:
Online Access:http://dspace.unimap.edu.my/xmlui/handle/123456789/22963
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.unimap-22963
record_format dspace
spelling my.unimap-229632013-01-15T02:00:41Z An improvement study of outgoing materials handling at Perodua Engine Manufacturing Sdn. Bhd. (PEMSB) Plant in Sg Choh Rawang, Selangor Mohd Fauzi, Mohd Noh Mohd Shuid Salleh, Assoc. Prof. Automobile industry Perodua Jundate station Engine production Lean manufacturing Material handling Access is limited to UniMAP community. An outgoing material handling improvement conducted in Perodua Engine Manufacturing Sdn. Bhd. (PEMSB) plant in Sg. Choh Rawang applies engineering theoretical knowledge into practice. Integration of both Toyota Production System (TPM) and Lean Thinking are made, in order to driven down the current problems and wastes in PEMSB plant. The main concerns of this project are to improve current process and arrangement of Jundate station along with its sub-assembly stations. The objective, scope and importance of this project are written and explained in chapter 1. Subsequently chapter 2 present literature of this project where the definition, introduction to Jundate K3/K5 station and other elements related to the station is outlined. Jundate station plays an important role in engine production at PEMSB plant. This station is responsible in supplying basis components in engine manufacturing like cylinder block, crank shaft and crankshaft to their belonging sub-assembly station. Besides that; analysis tool such as Movement/Operation (MO) ratio, Handling Equipment Utilization (HEU) Ratio and NIOSH lifting equation are also briefed in chapter 2 as well. Chapter 3 will explained the methodology of the whole project; starting from the understanding of project title until presentation stage. Next is chapter 4; where each problem related to Jundate station (based on factory observation) are listed and discussed in details. Evidences of problems in Jundate station are revealed by analysis tools that already discussed in chapter 2. As a result to detail analysis in chapter 4, chapter 5 proposes the improvement and implementation in Jundate station. Propose improvements are in the forms of station arrangement, working process, facilities utilization and other kaizen activities. The final results and conclusions of this project will be documented in chapter 6. This final chapter will concluded the whole study of improvement activities and some recommendation for future project study. Continuous improvement within quality, material handling, and work procedures is crucial in order to eliminate waste and achieve well working lean manufacturing system. Establishment towards this goals required full support from workers and top management. 2013-01-15T02:00:41Z 2013-01-15T02:00:41Z 2009-05 Learning Object http://hdl.handle.net/123456789/22963 en Universiti Malaysia Perlis School of Manufacturing Engineering
institution Universiti Malaysia Perlis
building UniMAP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Perlis
content_source UniMAP Library Digital Repository
url_provider http://dspace.unimap.edu.my/
language English
topic Automobile industry
Perodua
Jundate station
Engine production
Lean manufacturing
Material handling
spellingShingle Automobile industry
Perodua
Jundate station
Engine production
Lean manufacturing
Material handling
Mohd Fauzi, Mohd Noh
An improvement study of outgoing materials handling at Perodua Engine Manufacturing Sdn. Bhd. (PEMSB) Plant in Sg Choh Rawang, Selangor
description Access is limited to UniMAP community.
author2 Mohd Shuid Salleh, Assoc. Prof.
author_facet Mohd Shuid Salleh, Assoc. Prof.
Mohd Fauzi, Mohd Noh
format Learning Object
author Mohd Fauzi, Mohd Noh
author_sort Mohd Fauzi, Mohd Noh
title An improvement study of outgoing materials handling at Perodua Engine Manufacturing Sdn. Bhd. (PEMSB) Plant in Sg Choh Rawang, Selangor
title_short An improvement study of outgoing materials handling at Perodua Engine Manufacturing Sdn. Bhd. (PEMSB) Plant in Sg Choh Rawang, Selangor
title_full An improvement study of outgoing materials handling at Perodua Engine Manufacturing Sdn. Bhd. (PEMSB) Plant in Sg Choh Rawang, Selangor
title_fullStr An improvement study of outgoing materials handling at Perodua Engine Manufacturing Sdn. Bhd. (PEMSB) Plant in Sg Choh Rawang, Selangor
title_full_unstemmed An improvement study of outgoing materials handling at Perodua Engine Manufacturing Sdn. Bhd. (PEMSB) Plant in Sg Choh Rawang, Selangor
title_sort improvement study of outgoing materials handling at perodua engine manufacturing sdn. bhd. (pemsb) plant in sg choh rawang, selangor
publisher Universiti Malaysia Perlis
publishDate 2013
url http://dspace.unimap.edu.my/xmlui/handle/123456789/22963
_version_ 1643790522595147776
score 13.214268