Taking over the lead
Link to publisher’s homepage at http://www.myiem.org.my/
Saved in:
Main Author: | Anon |
---|---|
Format: | Article |
Language: | English |
Published: |
The Institution of Engineers, Malaysia
2011
|
Subjects: | |
Online Access: | http://dspace.unimap.edu.my/xmlui/handle/123456789/15453 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Rehabilitation of the beach at Teluk Cempedak, Pahang, using Pressure Equalisation Modules (PEM) system
by: Tan, King Seng, et al.
Published: (2011) -
An assessment of stormwater management practices in Malaysia
by: Lariyah, Mohd Sidek, Ir. Dr., et al.
Published: (2011) -
Perlis govt must answer for floods
by: Anon
Published: (2018) -
Uniten and DID sign pact
by: Lee, Chonghui
Published: (2018) -
Perlis dam at normal level, supply cam last 4 months
by: Anon
Published: (2019)