PM : Sediakan laporan impak setiap projek
Saved in:
Main Authors: | Mustafa Kamal Basri, Sadatul Mahiran Rosli, Nolizah Abas |
---|---|
Format: | Article |
Language: | other |
Published: |
Utusan Malaysia
2008
|
Subjects: | |
Online Access: | http://dspace.unimap.edu.my/xmlui/handle/123456789/1147 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
PM : I'll not tolerate shoddy work or delays
by: Sulok Tawie
Published: (2008) -
Teruskan matlamat wawasan 2020 : PM
by: Zaharah Othman
Published: (2008) -
Projek RMK-9 lancar
by: Khairul Anuar Abdul Samad
Published: (2008) -
Semua negeri komited percepat projek RMK-9
Published: (2008) -
Negeri diarah segera laksana projek RMK-9
Published: (2008)