Improved final contractor selection using fuzzy method
1st Regional Conference on Applied and Engineering Mathematics (RCAEM-I) 2010 organized by Universiti Malaysia Perlis (UniMAP) and co-organized by Universiti Sains Malaysia (USM) & Universiti Kebangsaan Malaysia (UKM), 2nd - 3rd June 2010 at Eastern & Oriental Hotel, Penang.
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Working Paper |
Language: | English |
Published: |
Universiti Malaysia Perlis (UniMAP)
2010
|
Subjects: | |
Online Access: | http://dspace.unimap.edu.my/xmlui/handle/123456789/10365 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.unimap-10365 |
---|---|
record_format |
dspace |
spelling |
my.unimap-103652010-12-03T13:11:29Z Improved final contractor selection using fuzzy method Chew, Yee Ming Ng, Kok Shien chewyeeming@perlis.uitm.edu.my ngkokshien@perlis.uitm.edu.my Contractor selection Fuzzy TOPSIS Regional Conference on Applied and Engineering Mathematics (RCAEM) 1st Regional Conference on Applied and Engineering Mathematics (RCAEM-I) 2010 organized by Universiti Malaysia Perlis (UniMAP) and co-organized by Universiti Sains Malaysia (USM) & Universiti Kebangsaan Malaysia (UKM), 2nd - 3rd June 2010 at Eastern & Oriental Hotel, Penang. Some contractor selection methods in construction projects are criticized as prejudiced. Therefore, a fuzzy TOPSIS method is proposed to improve the final contractor selection. In this technique, the ratings of the contractors versus eight main criteria and its sub criteria and the weights of all the criteria are assessed by fuzzy numbers. The feasibility of the suggested fuzzy TOPSIS method was checked using a hypothetical case study. It has shown that award of contract should be made on a value for money basis, with proper weighting of criteria for skill, experience and previous performance, rather than automatically accepting the lowest in all cases. 2010-12-03T13:11:29Z 2010-12-03T13:11:29Z 2010-06-02 Working Paper Vol.5(1), p.463 http://hdl.handle.net/123456789/10365 en Proceedings of the 1st Regional Conference on Applied and Engineering Mathematics (RCAEM-I) 2010 Universiti Malaysia Perlis (UniMAP) Institut Matematik Kejuruteraan |
institution |
Universiti Malaysia Perlis |
building |
UniMAP Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Perlis |
content_source |
UniMAP Library Digital Repository |
url_provider |
http://dspace.unimap.edu.my/ |
language |
English |
topic |
Contractor selection Fuzzy TOPSIS Regional Conference on Applied and Engineering Mathematics (RCAEM) |
spellingShingle |
Contractor selection Fuzzy TOPSIS Regional Conference on Applied and Engineering Mathematics (RCAEM) Chew, Yee Ming Ng, Kok Shien Improved final contractor selection using fuzzy method |
description |
1st Regional Conference on Applied and Engineering Mathematics (RCAEM-I) 2010 organized by Universiti Malaysia Perlis (UniMAP) and co-organized by Universiti Sains Malaysia (USM) & Universiti Kebangsaan Malaysia (UKM), 2nd - 3rd June 2010 at Eastern & Oriental Hotel, Penang. |
author2 |
chewyeeming@perlis.uitm.edu.my |
author_facet |
chewyeeming@perlis.uitm.edu.my Chew, Yee Ming Ng, Kok Shien |
format |
Working Paper |
author |
Chew, Yee Ming Ng, Kok Shien |
author_sort |
Chew, Yee Ming |
title |
Improved final contractor selection using fuzzy method |
title_short |
Improved final contractor selection using fuzzy method |
title_full |
Improved final contractor selection using fuzzy method |
title_fullStr |
Improved final contractor selection using fuzzy method |
title_full_unstemmed |
Improved final contractor selection using fuzzy method |
title_sort |
improved final contractor selection using fuzzy method |
publisher |
Universiti Malaysia Perlis (UniMAP) |
publishDate |
2010 |
url |
http://dspace.unimap.edu.my/xmlui/handle/123456789/10365 |
_version_ |
1643789833111339008 |
score |
13.222552 |