Development of Conceptual Model for Uncertainty Management on Project Completion Late Delivery in Environmental Issues
Conference venue:Madrid,Spain
Saved in:
Main Authors: | , , |
---|---|
Format: | |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://localhost/xmlui/handle/123456789/8969 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.unikl.ir-8969 |
---|---|
record_format |
eprints |
spelling |
my.unikl.ir-89692015-06-30T05:33:21Z Development of Conceptual Model for Uncertainty Management on Project Completion Late Delivery in Environmental Issues Zirawani Baharum Noorfa H. Mustaffa Salihin M.Ngadiman Uncertainty Conceptual Model Late Delivery Environmental Issues Construction Conference venue:Madrid,Spain The construction industry has many underlying causes of uncertainty that impact on late delivery of project completion's performance as well as in time management. Most of researchers proposed a modelling and simulation techniques to solve these uncertainties problem nevertheless not tackling the uncertainty in environmental issues (EI). Yet, the environmental issues were also leading significant deviations for project completion performance, which means it is important to be studied.Therefore, the comprehensive sturvey is discussed in this paper in purpose to develop the uncertainty modeling model on late delivery in environmental issues. The development of conceptual model through a comprehensive survey involving piping's construction industry for water supply company with multi-project construction environment is developed to show the relationship for each cause and affects that underlying uncertainty on late project delivery in environmental issues. Further research is to verify and validate the conceptual model as has been analyzed through fractional factorial design with ANOVA, through the development of uncertainty model via modeling and simulation using MATLAB. 2014-12-11T01:49:17Z 2014-12-11T01:49:17Z 2014-12-11 http://localhost/xmlui/handle/123456789/8969 en |
institution |
Universiti Kuala Lumpur |
building |
UniKL Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Kuala Lumpur |
content_source |
UniKL Institutional Repository |
url_provider |
http://ir.unikl.edu.my/ |
language |
English |
topic |
Uncertainty Conceptual Model Late Delivery Environmental Issues Construction |
spellingShingle |
Uncertainty Conceptual Model Late Delivery Environmental Issues Construction Zirawani Baharum Noorfa H. Mustaffa Salihin M.Ngadiman Development of Conceptual Model for Uncertainty Management on Project Completion Late Delivery in Environmental Issues |
description |
Conference venue:Madrid,Spain |
format |
|
author |
Zirawani Baharum Noorfa H. Mustaffa Salihin M.Ngadiman |
author_facet |
Zirawani Baharum Noorfa H. Mustaffa Salihin M.Ngadiman |
author_sort |
Zirawani Baharum |
title |
Development of Conceptual Model for Uncertainty Management on Project Completion Late Delivery in Environmental Issues |
title_short |
Development of Conceptual Model for Uncertainty Management on Project Completion Late Delivery in Environmental Issues |
title_full |
Development of Conceptual Model for Uncertainty Management on Project Completion Late Delivery in Environmental Issues |
title_fullStr |
Development of Conceptual Model for Uncertainty Management on Project Completion Late Delivery in Environmental Issues |
title_full_unstemmed |
Development of Conceptual Model for Uncertainty Management on Project Completion Late Delivery in Environmental Issues |
title_sort |
development of conceptual model for uncertainty management on project completion late delivery in environmental issues |
publishDate |
2014 |
url |
http://localhost/xmlui/handle/123456789/8969 |
_version_ |
1644485026183643136 |
score |
13.214268 |