Project ID : An Application Of Carrier E 20 HAP

This final year project report details is about to get a total cooling load for UniKLMFI new building that located in, Bangi. This building generally is for education for UniKLMFI students.There is much multipurpose room to calculate the load with different criteria...

Full description

Saved in:
Bibliographic Details
Main Authors: Juliana Abd Ghani, Muhd Anuar Muhd Helmi, Nik Mohd Alif Nik Yahaya
Format:
Published: 2014
Online Access:http://localhost/xmlui/handle/123456789/6849
Tags: Add Tag
No Tags, Be the first to tag this record!