DESIGN AND CONSTRUCTION OF 8 METER BOAT TRAILER (MAIN BODY)
During the Final Year Project, we have been assigned for boat trailer that was conducted by Mr. Abdul Aziz Bin Abdul Rahim. This project consist four people to complete this project, we have divide into two group. One group consist two people, for the first group is assigned to develop the design an...
Saved in:
Main Authors: | , , |
---|---|
Format: | Book |
Language: | English |
Published: |
2015
|
Online Access: | http://localhost/xmlui/handle/123456789/10283 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.unikl.ir-10283 |
---|---|
record_format |
eprints |
spelling |
my.unikl.ir-102832015-06-24T02:58:29Z DESIGN AND CONSTRUCTION OF 8 METER BOAT TRAILER (MAIN BODY) MUHAMMAD BIN ABDULL LATIFF MUHAMMAD IRFAN BIN ISMAIL HASHIM UNIKL MIMET During the Final Year Project, we have been assigned for boat trailer that was conducted by Mr. Abdul Aziz Bin Abdul Rahim. This project consist four people to complete this project, we have divide into two group. One group consist two people, for the first group is assigned to develop the design and construction of the main body project and other group is to make the report for outfitting and construction of the project. We are the first group that makes the design process report for this project. Although the groups are separate into two, but the both work design and construction of main body and outfitting, we still progress the work together. 2015-06-24T02:58:29Z 2015-06-24T02:58:29Z 2015-06-24 Book http://localhost/xmlui/handle/123456789/10283 en |
institution |
Universiti Kuala Lumpur |
building |
UniKL Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Kuala Lumpur |
content_source |
UniKL Institutional Repository |
url_provider |
http://ir.unikl.edu.my/ |
language |
English |
description |
During the Final Year Project, we have been assigned for boat trailer that was conducted by Mr. Abdul Aziz Bin Abdul Rahim. This project consist four people to complete this project, we have divide into two group. One group consist two people, for the first group is assigned to develop the design and construction of the main body project and other group is to make the report for outfitting and construction of the project. We are the first group that makes the design process report for this project. Although the groups are separate into two, but the both work design and construction of main body and outfitting, we still progress the work together. |
format |
Book |
author |
MUHAMMAD BIN ABDULL LATIFF MUHAMMAD IRFAN BIN ISMAIL HASHIM UNIKL MIMET |
spellingShingle |
MUHAMMAD BIN ABDULL LATIFF MUHAMMAD IRFAN BIN ISMAIL HASHIM UNIKL MIMET DESIGN AND CONSTRUCTION OF 8 METER BOAT TRAILER (MAIN BODY) |
author_facet |
MUHAMMAD BIN ABDULL LATIFF MUHAMMAD IRFAN BIN ISMAIL HASHIM UNIKL MIMET |
author_sort |
MUHAMMAD BIN ABDULL LATIFF |
title |
DESIGN AND CONSTRUCTION OF 8 METER BOAT TRAILER (MAIN BODY) |
title_short |
DESIGN AND CONSTRUCTION OF 8 METER BOAT TRAILER (MAIN BODY) |
title_full |
DESIGN AND CONSTRUCTION OF 8 METER BOAT TRAILER (MAIN BODY) |
title_fullStr |
DESIGN AND CONSTRUCTION OF 8 METER BOAT TRAILER (MAIN BODY) |
title_full_unstemmed |
DESIGN AND CONSTRUCTION OF 8 METER BOAT TRAILER (MAIN BODY) |
title_sort |
design and construction of 8 meter boat trailer (main body) |
publishDate |
2015 |
url |
http://localhost/xmlui/handle/123456789/10283 |
_version_ |
1644485141759787008 |
score |
13.222552 |