Optimisation of 4D (project timeline) and 5D (budget analysis) in building information modelling (BIM) for house refurbishment and renovation

The potential of 4D and 5D Building Information Modelling (BIM) have been proven to facilitate project timeline and budget analysis in construction industry, however the implementation of 4D and 5D BIM in house renovation and refurbishment is still underdeveloped especially in Malaysia. Therefore, t...

Full description

Saved in:
Bibliographic Details
Main Author: Nurdini Atiqah Talib
Format: Academic Exercise
Language:English
English
Published: 2022
Subjects:
Online Access:https://eprints.ums.edu.my/id/eprint/35174/1/24%20PAGES.pdf
https://eprints.ums.edu.my/id/eprint/35174/2/FULLTEXT.pdf
https://eprints.ums.edu.my/id/eprint/35174/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ums.eprints.35174
record_format eprints
spelling my.ums.eprints.351742023-03-09T02:41:34Z https://eprints.ums.edu.my/id/eprint/35174/ Optimisation of 4D (project timeline) and 5D (budget analysis) in building information modelling (BIM) for house refurbishment and renovation Nurdini Atiqah Talib TH1-9745 Building construction The potential of 4D and 5D Building Information Modelling (BIM) have been proven to facilitate project timeline and budget analysis in construction industry, however the implementation of 4D and 5D BIM in house renovation and refurbishment is still underdeveloped especially in Malaysia. Therefore, this study was conducted purposedly to identify the advantages of 4D and 5D BIM, to analyse the level of awareness of 4D and 5D BIM implementation and to pave a proper strategy for house refurbishment and renovation using BIM in Malaysia. The method uses to achieve the objectives was questioners survey that was analyse using SPSS and modelling using Autodesk Revit for 3D model and Navisworks Manage for 4D and 5D BIM. The selected model is based on the two and a half storey terrace houses at Taman Bukit Sepangar Kota Kinabalu Sabah. This study manages to collect 45 responded from construction player. The results revealed that the significant advantages of 4D BIM are early simulation that will detect any clashes which usually lead to construction delay with mean rank of 4.36, 4D BIM could provide a clear walk through before the construction begin rated second with 4.22 mean rank and 4D BIM could serve as centralized data rated third with 4.20 mean rank. 5D BIM on the other hand will significantly contribute to faster and accurate quantity take off with scored of 4.40 mean rank, forecast early cost estimation and can improve collaboration between project stockholders on early stage of construction rated second and third with mean rank of 4.29 and 4.20 respectively. However, it is found that the level of BIM implementation in Malaysia currently is still low due to low BIM adoption and unreadiness of organization to adopt BIM. Thus, to carter this problem, it is suggested to set a standard of curriculum at higher institution to train and introduce what is BIM, provide subsidy for BIM software and provide training for construction players will significantly enhance BIM implementation. 2022 Academic Exercise NonPeerReviewed text en https://eprints.ums.edu.my/id/eprint/35174/1/24%20PAGES.pdf text en https://eprints.ums.edu.my/id/eprint/35174/2/FULLTEXT.pdf Nurdini Atiqah Talib (2022) Optimisation of 4D (project timeline) and 5D (budget analysis) in building information modelling (BIM) for house refurbishment and renovation. Universiti Malaysia Sabah. (Unpublished)
institution Universiti Malaysia Sabah
building UMS Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Sabah
content_source UMS Institutional Repository
url_provider http://eprints.ums.edu.my/
language English
English
topic TH1-9745 Building construction
spellingShingle TH1-9745 Building construction
Nurdini Atiqah Talib
Optimisation of 4D (project timeline) and 5D (budget analysis) in building information modelling (BIM) for house refurbishment and renovation
description The potential of 4D and 5D Building Information Modelling (BIM) have been proven to facilitate project timeline and budget analysis in construction industry, however the implementation of 4D and 5D BIM in house renovation and refurbishment is still underdeveloped especially in Malaysia. Therefore, this study was conducted purposedly to identify the advantages of 4D and 5D BIM, to analyse the level of awareness of 4D and 5D BIM implementation and to pave a proper strategy for house refurbishment and renovation using BIM in Malaysia. The method uses to achieve the objectives was questioners survey that was analyse using SPSS and modelling using Autodesk Revit for 3D model and Navisworks Manage for 4D and 5D BIM. The selected model is based on the two and a half storey terrace houses at Taman Bukit Sepangar Kota Kinabalu Sabah. This study manages to collect 45 responded from construction player. The results revealed that the significant advantages of 4D BIM are early simulation that will detect any clashes which usually lead to construction delay with mean rank of 4.36, 4D BIM could provide a clear walk through before the construction begin rated second with 4.22 mean rank and 4D BIM could serve as centralized data rated third with 4.20 mean rank. 5D BIM on the other hand will significantly contribute to faster and accurate quantity take off with scored of 4.40 mean rank, forecast early cost estimation and can improve collaboration between project stockholders on early stage of construction rated second and third with mean rank of 4.29 and 4.20 respectively. However, it is found that the level of BIM implementation in Malaysia currently is still low due to low BIM adoption and unreadiness of organization to adopt BIM. Thus, to carter this problem, it is suggested to set a standard of curriculum at higher institution to train and introduce what is BIM, provide subsidy for BIM software and provide training for construction players will significantly enhance BIM implementation.
format Academic Exercise
author Nurdini Atiqah Talib
author_facet Nurdini Atiqah Talib
author_sort Nurdini Atiqah Talib
title Optimisation of 4D (project timeline) and 5D (budget analysis) in building information modelling (BIM) for house refurbishment and renovation
title_short Optimisation of 4D (project timeline) and 5D (budget analysis) in building information modelling (BIM) for house refurbishment and renovation
title_full Optimisation of 4D (project timeline) and 5D (budget analysis) in building information modelling (BIM) for house refurbishment and renovation
title_fullStr Optimisation of 4D (project timeline) and 5D (budget analysis) in building information modelling (BIM) for house refurbishment and renovation
title_full_unstemmed Optimisation of 4D (project timeline) and 5D (budget analysis) in building information modelling (BIM) for house refurbishment and renovation
title_sort optimisation of 4d (project timeline) and 5d (budget analysis) in building information modelling (bim) for house refurbishment and renovation
publishDate 2022
url https://eprints.ums.edu.my/id/eprint/35174/1/24%20PAGES.pdf
https://eprints.ums.edu.my/id/eprint/35174/2/FULLTEXT.pdf
https://eprints.ums.edu.my/id/eprint/35174/
_version_ 1760231393070153728
score 13.209306