Construction of multiple design and build bridge projects: case study in Sabah

Among the various procurement methods the Design and Build (D&B) projects is significant in implementing development projects in Malaysia and other countries. When an organization undertakes multiple D&B projects involving multiple designers, contractors, subcontractors, construction manager...

Full description

Saved in:
Bibliographic Details
Main Author: Chidambaram Ramanathan
Format: Thesis
Language:English
Published: 2008
Subjects:
Online Access:https://eprints.ums.edu.my/id/eprint/27033/1/Construction%20of%20multiple%20design%20and%20build%20bridge%20projects%20case%20study%20in%20Sabah.pdf
https://eprints.ums.edu.my/id/eprint/27033/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ums.eprints.27033
record_format eprints
spelling my.ums.eprints.270332021-06-02T03:22:08Z https://eprints.ums.edu.my/id/eprint/27033/ Construction of multiple design and build bridge projects: case study in Sabah Chidambaram Ramanathan TG Bridge engineering Among the various procurement methods the Design and Build (D&B) projects is significant in implementing development projects in Malaysia and other countries. When an organization undertakes multiple D&B projects involving multiple designers, contractors, subcontractors, construction managers, consultants and specialists the project management becomes more complex with many variables affecting the project execution. In addition, increasing linkages between projects, the need to integrate parts and resulting increasing interdependencies makes it more complex. Not many studies have been reported on these critical aspects and about suitable project management system to overcome the complexities. Selected infrastructure projects are being implemented under D&B method in Sabah, in which, 45 Bridges and two Road projects are being executed simultaneously by the author’s Design and Build firm. A case study approach was adopted to study the multiple D & B projects in Sabah. The aspects that were studied are: (1) the project planning, control and monitoring methods, (2) Aspects of specialist works, diversion works, temporary works, and logistics, (3) construction program and management, project cost optimization; tendering and final close out,(4) team building and (5) Selecting of Methods of pile foundation, suitable beam technologies, No. of spans, etc. The study has identified an effective D&B process for multiple project execution. The findings will help to reduce the complexity in performing the activities as per the master project management plan drafted for multi project settings. The tasks in team building best suited to multiple D&B projects are also identified. The contribution of this study is two folds: Firstly, to prepare “guideline procedures” in preparing productive construction programme for multiple projects. Secondly, to identify the key points in scheduling the works programme to reduce the resource idle time and complete the projects in specific time, budget and according to specification. Results and findings are reported with examples from case studies. 2008 Thesis NonPeerReviewed text en https://eprints.ums.edu.my/id/eprint/27033/1/Construction%20of%20multiple%20design%20and%20build%20bridge%20projects%20case%20study%20in%20Sabah.pdf Chidambaram Ramanathan (2008) Construction of multiple design and build bridge projects: case study in Sabah. Masters thesis, Universiti Malaysia Sabah.
institution Universiti Malaysia Sabah
building UMS Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Sabah
content_source UMS Institutional Repository
url_provider http://eprints.ums.edu.my/
language English
topic TG Bridge engineering
spellingShingle TG Bridge engineering
Chidambaram Ramanathan
Construction of multiple design and build bridge projects: case study in Sabah
description Among the various procurement methods the Design and Build (D&B) projects is significant in implementing development projects in Malaysia and other countries. When an organization undertakes multiple D&B projects involving multiple designers, contractors, subcontractors, construction managers, consultants and specialists the project management becomes more complex with many variables affecting the project execution. In addition, increasing linkages between projects, the need to integrate parts and resulting increasing interdependencies makes it more complex. Not many studies have been reported on these critical aspects and about suitable project management system to overcome the complexities. Selected infrastructure projects are being implemented under D&B method in Sabah, in which, 45 Bridges and two Road projects are being executed simultaneously by the author’s Design and Build firm. A case study approach was adopted to study the multiple D & B projects in Sabah. The aspects that were studied are: (1) the project planning, control and monitoring methods, (2) Aspects of specialist works, diversion works, temporary works, and logistics, (3) construction program and management, project cost optimization; tendering and final close out,(4) team building and (5) Selecting of Methods of pile foundation, suitable beam technologies, No. of spans, etc. The study has identified an effective D&B process for multiple project execution. The findings will help to reduce the complexity in performing the activities as per the master project management plan drafted for multi project settings. The tasks in team building best suited to multiple D&B projects are also identified. The contribution of this study is two folds: Firstly, to prepare “guideline procedures” in preparing productive construction programme for multiple projects. Secondly, to identify the key points in scheduling the works programme to reduce the resource idle time and complete the projects in specific time, budget and according to specification. Results and findings are reported with examples from case studies.
format Thesis
author Chidambaram Ramanathan
author_facet Chidambaram Ramanathan
author_sort Chidambaram Ramanathan
title Construction of multiple design and build bridge projects: case study in Sabah
title_short Construction of multiple design and build bridge projects: case study in Sabah
title_full Construction of multiple design and build bridge projects: case study in Sabah
title_fullStr Construction of multiple design and build bridge projects: case study in Sabah
title_full_unstemmed Construction of multiple design and build bridge projects: case study in Sabah
title_sort construction of multiple design and build bridge projects: case study in sabah
publishDate 2008
url https://eprints.ums.edu.my/id/eprint/27033/1/Construction%20of%20multiple%20design%20and%20build%20bridge%20projects%20case%20study%20in%20Sabah.pdf
https://eprints.ums.edu.my/id/eprint/27033/
_version_ 1760230572127420416
score 13.160551