Cfd simulation study on the effect of leak size towards oil leakage from submarine pipelines

This paper presents Computational fluid dynamic (CFD) studies on leak size effect towards the time taken for migration of oil droplets to reach free surface upon leakage. The size of the leakage hole (d) is a variable ranging from 0.1 m to 0.3 m with increment of 0.1m whereas the other parameter is...

Full description

Saved in:
Bibliographic Details
Main Author: Mahadi, Bahari
Format: Undergraduates Project Papers
Language:English
Published: 2014
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/9195/1/20.Cfd%20simulation%20study%20on%20the%20effect%20of%20leak%20size%20towards%20oil%20leakage%20from%20submarine%20pipelines.pdf
http://umpir.ump.edu.my/id/eprint/9195/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.9195
record_format eprints
spelling my.ump.umpir.91952023-07-10T04:09:31Z http://umpir.ump.edu.my/id/eprint/9195/ Cfd simulation study on the effect of leak size towards oil leakage from submarine pipelines Mahadi, Bahari TP Chemical technology This paper presents Computational fluid dynamic (CFD) studies on leak size effect towards the time taken for migration of oil droplets to reach free surface upon leakage. The size of the leakage hole (d) is a variable ranging from 0.1 m to 0.3 m with increment of 0.1m whereas the other parameter is fixed. A computational rectangular domain with length of 20m and height of 15m was simulated in Gambit 2.4. The length of computational domain is large enough, which is larger than the longest horizontal distance the oil droplets migrate when they reach the sea surface. In the Gambit 2.4, the time taken for the oil droplets to reach free surface was observed by varying the leak size; d1=0.1m, d2= 0.2m and d3=0.3m respectively. . The outer diameter (D) of damaged submarine pipeline is 0.5 m. The mesh was generated and exported to Fluent. Using the formulas we can obtain when and where to see oil reaching the sea surface, and conduct rapid response the maximum horizontal migration distance of oil at certain time is predicted, and a forecasting model is proposed. These calculated results will provide useful guidance to place the oil containment boom. Results were observed at 1000 number of time steps (iterations) with a step size of 0.1s. For the leak size 0.1m, the time taken for the oil to reach the free surface is 64s. For leak size 0.2m, , the time taken for the oil to reach the free surface had decrease to 55s. On the other hand, for the large leak size 0.3m, time taken for the oil to reach the free surface had decreased to 52s. As the conclusion, the leak size of pipeline can affects the time taken for oil to reach free surface upon leakage in pipeline 2014-07 Undergraduates Project Papers NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/9195/1/20.Cfd%20simulation%20study%20on%20the%20effect%20of%20leak%20size%20towards%20oil%20leakage%20from%20submarine%20pipelines.pdf Mahadi, Bahari (2014) Cfd simulation study on the effect of leak size towards oil leakage from submarine pipelines. Faculty of Chemical & Natural Resources Engineering, Universiti Malaysia Pahang.
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic TP Chemical technology
spellingShingle TP Chemical technology
Mahadi, Bahari
Cfd simulation study on the effect of leak size towards oil leakage from submarine pipelines
description This paper presents Computational fluid dynamic (CFD) studies on leak size effect towards the time taken for migration of oil droplets to reach free surface upon leakage. The size of the leakage hole (d) is a variable ranging from 0.1 m to 0.3 m with increment of 0.1m whereas the other parameter is fixed. A computational rectangular domain with length of 20m and height of 15m was simulated in Gambit 2.4. The length of computational domain is large enough, which is larger than the longest horizontal distance the oil droplets migrate when they reach the sea surface. In the Gambit 2.4, the time taken for the oil droplets to reach free surface was observed by varying the leak size; d1=0.1m, d2= 0.2m and d3=0.3m respectively. . The outer diameter (D) of damaged submarine pipeline is 0.5 m. The mesh was generated and exported to Fluent. Using the formulas we can obtain when and where to see oil reaching the sea surface, and conduct rapid response the maximum horizontal migration distance of oil at certain time is predicted, and a forecasting model is proposed. These calculated results will provide useful guidance to place the oil containment boom. Results were observed at 1000 number of time steps (iterations) with a step size of 0.1s. For the leak size 0.1m, the time taken for the oil to reach the free surface is 64s. For leak size 0.2m, , the time taken for the oil to reach the free surface had decrease to 55s. On the other hand, for the large leak size 0.3m, time taken for the oil to reach the free surface had decreased to 52s. As the conclusion, the leak size of pipeline can affects the time taken for oil to reach free surface upon leakage in pipeline
format Undergraduates Project Papers
author Mahadi, Bahari
author_facet Mahadi, Bahari
author_sort Mahadi, Bahari
title Cfd simulation study on the effect of leak size towards oil leakage from submarine pipelines
title_short Cfd simulation study on the effect of leak size towards oil leakage from submarine pipelines
title_full Cfd simulation study on the effect of leak size towards oil leakage from submarine pipelines
title_fullStr Cfd simulation study on the effect of leak size towards oil leakage from submarine pipelines
title_full_unstemmed Cfd simulation study on the effect of leak size towards oil leakage from submarine pipelines
title_sort cfd simulation study on the effect of leak size towards oil leakage from submarine pipelines
publishDate 2014
url http://umpir.ump.edu.my/id/eprint/9195/1/20.Cfd%20simulation%20study%20on%20the%20effect%20of%20leak%20size%20towards%20oil%20leakage%20from%20submarine%20pipelines.pdf
http://umpir.ump.edu.my/id/eprint/9195/
_version_ 1772811331578101760
score 13.160551