Optimize flow layout and analysis of effectiveness at bi technologies Corporation Sdn. Bhd

Agilent Production cell 6 fosters inefficient production practices, is outdated for its existing process, and lacking in product flow. A plant optimization is applied to bring order, efficiency, and optimize flow in the production lines. Deliverables include a proposed process and material flow that...

Full description

Saved in:
Bibliographic Details
Main Author: Nur Afiqah , Noor Azman
Format: Undergraduates Project Papers
Language:English
English
English
Published: 2013
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/6547/1/CD7718.pdf
http://umpir.ump.edu.my/id/eprint/6547/4/NUR%20AFIQAH%20NOOR%20AZMAN%20%28CD7718%29%20-%20CHAP%201.pdf
http://umpir.ump.edu.my/id/eprint/6547/5/NUR%20AFIQAH%20NOOR%20AZMAN%20%28CD7718%29%20-%20CHAP%203.pdf
http://umpir.ump.edu.my/id/eprint/6547/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.6547
record_format eprints
spelling my.ump.umpir.65472021-06-23T03:04:42Z http://umpir.ump.edu.my/id/eprint/6547/ Optimize flow layout and analysis of effectiveness at bi technologies Corporation Sdn. Bhd Nur Afiqah , Noor Azman TS Manufactures Agilent Production cell 6 fosters inefficient production practices, is outdated for its existing process, and lacking in product flow. A plant optimization is applied to bring order, efficiency, and optimize flow in the production lines. Deliverables include a proposed process and material flow that decreases product travel distances, cross flow and increases productivity as well as effectiveness of the proposed optimization analysis. Major modification of the cell decisions include downsizing the existing cell, sorting to find waste in material handling and establishing a clear process/product flows. The proposed plant optimization was analysis and results yield 100% productivity. The percentage efficiency of the optimize flow layout is 80% compared to 67% in existing flow layout. The analysis of efficiency has been increased to 13% in the proposed process flow. The product travel distance also has been reduced from 93 feet’s to 20 feet’s. 2013-06 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/6547/1/CD7718.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/6547/4/NUR%20AFIQAH%20NOOR%20AZMAN%20%28CD7718%29%20-%20CHAP%201.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/6547/5/NUR%20AFIQAH%20NOOR%20AZMAN%20%28CD7718%29%20-%20CHAP%203.pdf Nur Afiqah , Noor Azman (2013) Optimize flow layout and analysis of effectiveness at bi technologies Corporation Sdn. Bhd. Faculty of Manufacturing Engineering , Universiti Malaysia Pahang.
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
English
English
topic TS Manufactures
spellingShingle TS Manufactures
Nur Afiqah , Noor Azman
Optimize flow layout and analysis of effectiveness at bi technologies Corporation Sdn. Bhd
description Agilent Production cell 6 fosters inefficient production practices, is outdated for its existing process, and lacking in product flow. A plant optimization is applied to bring order, efficiency, and optimize flow in the production lines. Deliverables include a proposed process and material flow that decreases product travel distances, cross flow and increases productivity as well as effectiveness of the proposed optimization analysis. Major modification of the cell decisions include downsizing the existing cell, sorting to find waste in material handling and establishing a clear process/product flows. The proposed plant optimization was analysis and results yield 100% productivity. The percentage efficiency of the optimize flow layout is 80% compared to 67% in existing flow layout. The analysis of efficiency has been increased to 13% in the proposed process flow. The product travel distance also has been reduced from 93 feet’s to 20 feet’s.
format Undergraduates Project Papers
author Nur Afiqah , Noor Azman
author_facet Nur Afiqah , Noor Azman
author_sort Nur Afiqah , Noor Azman
title Optimize flow layout and analysis of effectiveness at bi technologies Corporation Sdn. Bhd
title_short Optimize flow layout and analysis of effectiveness at bi technologies Corporation Sdn. Bhd
title_full Optimize flow layout and analysis of effectiveness at bi technologies Corporation Sdn. Bhd
title_fullStr Optimize flow layout and analysis of effectiveness at bi technologies Corporation Sdn. Bhd
title_full_unstemmed Optimize flow layout and analysis of effectiveness at bi technologies Corporation Sdn. Bhd
title_sort optimize flow layout and analysis of effectiveness at bi technologies corporation sdn. bhd
publishDate 2013
url http://umpir.ump.edu.my/id/eprint/6547/1/CD7718.pdf
http://umpir.ump.edu.my/id/eprint/6547/4/NUR%20AFIQAH%20NOOR%20AZMAN%20%28CD7718%29%20-%20CHAP%201.pdf
http://umpir.ump.edu.my/id/eprint/6547/5/NUR%20AFIQAH%20NOOR%20AZMAN%20%28CD7718%29%20-%20CHAP%203.pdf
http://umpir.ump.edu.my/id/eprint/6547/
_version_ 1703960722413715456
score 13.149126