Analysing the project delay causes and improving quality using multi-project strategies
Numerous reasons for project delays from the viewpoints of the client and the contractor have only been somewhat studied. The aim of this paper is to recognize the delays' underlying causes and issues ways to reduce them considering the progress of the project. Consequently, 106 contractor-side...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit Akademia Baru
2024
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/41252/1/Analysing%20the%20Project%20Delay%20Causes%20andImproving%20Quality%20using%20Multi-Project%20Strategies.pdf http://umpir.ump.edu.my/id/eprint/41252/ https://doi.org/10.37934/arbms.34.1.2334 https://doi.org/10.37934/arbms.34.1.2334 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.ump.umpir.41252 |
---|---|
record_format |
eprints |
spelling |
my.ump.umpir.412522024-05-17T03:17:56Z http://umpir.ump.edu.my/id/eprint/41252/ Analysing the project delay causes and improving quality using multi-project strategies Nur Amirah Syahirah, Azman Faizir, Ramlie Wan Zuki Azman, Wan Muhamad Mohd Yazid, Abu Nolia, Harudin HD Industries. Land use. Labor TS Manufactures Numerous reasons for project delays from the viewpoints of the client and the contractor have only been somewhat studied. The aim of this paper is to recognize the delays' underlying causes and issues ways to reduce them considering the progress of the project. Consequently, 106 contractor-side experts and 82 client-side experts in project management were the subjects of this study. The clients and contractors gave the same importance to factors like poor communications and governmental approvals in projects that were successful (had a time delay of less than 10%). Similar mitigating techniques including rigorous project monitoring, skill development training, and effective logistics planning were advised. When projects were unsuccessful (with a time delay of more than 10%), they displayed a wide range of behaviours. Penerbit Akademia Baru 2024-02 Article PeerReviewed pdf en cc_by_nc_4 http://umpir.ump.edu.my/id/eprint/41252/1/Analysing%20the%20Project%20Delay%20Causes%20andImproving%20Quality%20using%20Multi-Project%20Strategies.pdf Nur Amirah Syahirah, Azman and Faizir, Ramlie and Wan Zuki Azman, Wan Muhamad and Mohd Yazid, Abu and Nolia, Harudin (2024) Analysing the project delay causes and improving quality using multi-project strategies. Journal of Advanced Research in Business and Management Studies, 34 (1). pp. 23-34. ISSN 2462-1935. (Published) https://doi.org/10.37934/arbms.34.1.2334 https://doi.org/10.37934/arbms.34.1.2334 |
institution |
Universiti Malaysia Pahang Al-Sultan Abdullah |
building |
UMPSA Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Pahang Al-Sultan Abdullah |
content_source |
UMPSA Institutional Repository |
url_provider |
http://umpir.ump.edu.my/ |
language |
English |
topic |
HD Industries. Land use. Labor TS Manufactures |
spellingShingle |
HD Industries. Land use. Labor TS Manufactures Nur Amirah Syahirah, Azman Faizir, Ramlie Wan Zuki Azman, Wan Muhamad Mohd Yazid, Abu Nolia, Harudin Analysing the project delay causes and improving quality using multi-project strategies |
description |
Numerous reasons for project delays from the viewpoints of the client and the contractor have only been somewhat studied. The aim of this paper is to recognize the delays' underlying causes and issues ways to reduce them considering the progress of the project. Consequently, 106 contractor-side experts and 82 client-side experts in project management were the subjects of this study. The clients and contractors gave the same importance to factors like poor communications and governmental approvals in projects that were successful (had a time delay of less than 10%). Similar mitigating techniques including rigorous project monitoring, skill development training, and effective logistics planning were advised. When projects were unsuccessful (with a time delay of more than 10%), they displayed a wide range of behaviours. |
format |
Article |
author |
Nur Amirah Syahirah, Azman Faizir, Ramlie Wan Zuki Azman, Wan Muhamad Mohd Yazid, Abu Nolia, Harudin |
author_facet |
Nur Amirah Syahirah, Azman Faizir, Ramlie Wan Zuki Azman, Wan Muhamad Mohd Yazid, Abu Nolia, Harudin |
author_sort |
Nur Amirah Syahirah, Azman |
title |
Analysing the project delay causes and improving quality using multi-project strategies |
title_short |
Analysing the project delay causes and improving quality using multi-project strategies |
title_full |
Analysing the project delay causes and improving quality using multi-project strategies |
title_fullStr |
Analysing the project delay causes and improving quality using multi-project strategies |
title_full_unstemmed |
Analysing the project delay causes and improving quality using multi-project strategies |
title_sort |
analysing the project delay causes and improving quality using multi-project strategies |
publisher |
Penerbit Akademia Baru |
publishDate |
2024 |
url |
http://umpir.ump.edu.my/id/eprint/41252/1/Analysing%20the%20Project%20Delay%20Causes%20andImproving%20Quality%20using%20Multi-Project%20Strategies.pdf http://umpir.ump.edu.my/id/eprint/41252/ https://doi.org/10.37934/arbms.34.1.2334 https://doi.org/10.37934/arbms.34.1.2334 |
_version_ |
1822924326568984576 |
score |
13.235796 |