Factors affecting BIM implementation in Saudi Arabia: a critical analysis

Purpose: This study examines the underlying relationships between the critical factors of building information modeling (BIM) implementation and the factors’ groupings among architecture, engineering and construction (AEC) organizations in Saudi Arabia. The objectives of the study are to (1) identif...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohammad S., Al-Mohammad, Ahmad Tarmizi, Haron, Rahimi, A. Rahman, Yasir, Alhammadi
Format: Article
Language:English
English
Published: Emerald Publishing Limited 2023
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/37895/1/Factors%20affecting%20BIM.pdf
http://umpir.ump.edu.my/id/eprint/37895/2/Factors%20affecting%20BIM%20implementation%20in%20Saudi%20Arabia%20a%20critical%20analysis.pdf
http://umpir.ump.edu.my/id/eprint/37895/
https://doi.org/10.1108/IJBPA-09-2021-0122
https://doi.org/10.1108/IJBPA-09-2021-0122
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.37895
record_format eprints
spelling my.ump.umpir.378952023-07-12T07:50:32Z http://umpir.ump.edu.my/id/eprint/37895/ Factors affecting BIM implementation in Saudi Arabia: a critical analysis Mohammad S., Al-Mohammad Ahmad Tarmizi, Haron Rahimi, A. Rahman Yasir, Alhammadi TA Engineering (General). Civil engineering (General) TH Building construction Purpose: This study examines the underlying relationships between the critical factors of building information modeling (BIM) implementation and the factors’ groupings among architecture, engineering and construction (AEC) organizations in Saudi Arabia. The objectives of the study are to (1) identify the critical factors for BIM implementation, (2) analyze the interrelationships between the critical factors and (3) compare the critical factors between the different organizational characteristics. Design/methodology/approach: First, potential factors were identified through a systematic literature review and interviews with AEC professionals. Then, a questionnaire survey was sent to AEC professionals and the collected data were analyzed using the following techniques and tests: mean score ranking, standard deviation, normalized value, factor analysis (FA), analysis of variance (ANOVA) and post-hoc Tukey test. Findings: The analyses show that 14 factors are critical for BIM implementation in Saudi Arabia. The top critical factors include the existence of standard contracts on data security and user confidentiality, consistent views on BIM among stakeholders and the availability of guidelines for implementing BIM. Of the 14 critical factors, 9 can be grouped into 4 underlying factors: environmental, governmental, legal and organizational. The analysis shows that the criticality of the most critical factors grouped by the FA varies between different levels of BIM competency. Finally, the presence of public–private partnerships (PPPs) in realizing BIM projects is a new and emerging critical factor for BIM implementation in Saudi Arabia. Originality/value: This study differs from prior works on BIM implementation in Saudi Arabia by using FA to explore the underlying relationships among factors of BIM implementation and the factors’ groupings. Based on the FA results, a roadmap for implementing the BIM was developed. These findings will help to purposefully and efficiently customize BIM implementation strategies and initiatives to ensure successful BIM implementation in Saudi Arabia. Emerald Publishing Limited 2023 Article NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/37895/1/Factors%20affecting%20BIM.pdf pdf en http://umpir.ump.edu.my/id/eprint/37895/2/Factors%20affecting%20BIM%20implementation%20in%20Saudi%20Arabia%20a%20critical%20analysis.pdf Mohammad S., Al-Mohammad and Ahmad Tarmizi, Haron and Rahimi, A. Rahman and Yasir, Alhammadi (2023) Factors affecting BIM implementation in Saudi Arabia: a critical analysis. International Journal of Building Pathology and Adaptation. ISSN 2398-4708. (In Press) (In Press) https://doi.org/10.1108/IJBPA-09-2021-0122 https://doi.org/10.1108/IJBPA-09-2021-0122
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
English
topic TA Engineering (General). Civil engineering (General)
TH Building construction
spellingShingle TA Engineering (General). Civil engineering (General)
TH Building construction
Mohammad S., Al-Mohammad
Ahmad Tarmizi, Haron
Rahimi, A. Rahman
Yasir, Alhammadi
Factors affecting BIM implementation in Saudi Arabia: a critical analysis
description Purpose: This study examines the underlying relationships between the critical factors of building information modeling (BIM) implementation and the factors’ groupings among architecture, engineering and construction (AEC) organizations in Saudi Arabia. The objectives of the study are to (1) identify the critical factors for BIM implementation, (2) analyze the interrelationships between the critical factors and (3) compare the critical factors between the different organizational characteristics. Design/methodology/approach: First, potential factors were identified through a systematic literature review and interviews with AEC professionals. Then, a questionnaire survey was sent to AEC professionals and the collected data were analyzed using the following techniques and tests: mean score ranking, standard deviation, normalized value, factor analysis (FA), analysis of variance (ANOVA) and post-hoc Tukey test. Findings: The analyses show that 14 factors are critical for BIM implementation in Saudi Arabia. The top critical factors include the existence of standard contracts on data security and user confidentiality, consistent views on BIM among stakeholders and the availability of guidelines for implementing BIM. Of the 14 critical factors, 9 can be grouped into 4 underlying factors: environmental, governmental, legal and organizational. The analysis shows that the criticality of the most critical factors grouped by the FA varies between different levels of BIM competency. Finally, the presence of public–private partnerships (PPPs) in realizing BIM projects is a new and emerging critical factor for BIM implementation in Saudi Arabia. Originality/value: This study differs from prior works on BIM implementation in Saudi Arabia by using FA to explore the underlying relationships among factors of BIM implementation and the factors’ groupings. Based on the FA results, a roadmap for implementing the BIM was developed. These findings will help to purposefully and efficiently customize BIM implementation strategies and initiatives to ensure successful BIM implementation in Saudi Arabia.
format Article
author Mohammad S., Al-Mohammad
Ahmad Tarmizi, Haron
Rahimi, A. Rahman
Yasir, Alhammadi
author_facet Mohammad S., Al-Mohammad
Ahmad Tarmizi, Haron
Rahimi, A. Rahman
Yasir, Alhammadi
author_sort Mohammad S., Al-Mohammad
title Factors affecting BIM implementation in Saudi Arabia: a critical analysis
title_short Factors affecting BIM implementation in Saudi Arabia: a critical analysis
title_full Factors affecting BIM implementation in Saudi Arabia: a critical analysis
title_fullStr Factors affecting BIM implementation in Saudi Arabia: a critical analysis
title_full_unstemmed Factors affecting BIM implementation in Saudi Arabia: a critical analysis
title_sort factors affecting bim implementation in saudi arabia: a critical analysis
publisher Emerald Publishing Limited
publishDate 2023
url http://umpir.ump.edu.my/id/eprint/37895/1/Factors%20affecting%20BIM.pdf
http://umpir.ump.edu.my/id/eprint/37895/2/Factors%20affecting%20BIM%20implementation%20in%20Saudi%20Arabia%20a%20critical%20analysis.pdf
http://umpir.ump.edu.my/id/eprint/37895/
https://doi.org/10.1108/IJBPA-09-2021-0122
https://doi.org/10.1108/IJBPA-09-2021-0122
_version_ 1772811340931399680
score 13.18916