Line balancing technique implementation in a small and medium industry

The objective of this project is about the implementation of line balancing technique in a Small and Medium Industry.The implementation of line balancing in Automotive Industry has brought significant improvement to the plant's productivity.However,line balancing technique is not commonly used...

Full description

Saved in:
Bibliographic Details
Main Author: Cek Seng, Koh
Format: Undergraduates Project Papers
Language:English
Published: 2012
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/3748/1/KOH_CEK_SENG.PDF
http://umpir.ump.edu.my/id/eprint/3748/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.3748
record_format eprints
spelling my.ump.umpir.37482021-07-08T04:30:44Z http://umpir.ump.edu.my/id/eprint/3748/ Line balancing technique implementation in a small and medium industry Cek Seng, Koh TS Manufactures The objective of this project is about the implementation of line balancing technique in a Small and Medium Industry.The implementation of line balancing in Automotive Industry has brought significant improvement to the plant's productivity.However,line balancing technique is not commonly used in Small and Medium Industry.The objective of this project is to simulate the line balancing technique and implement it in a Small and Medium Industry.The simulation was done using software called Arena where it gave overall picture of the future condition and analyze the result of production after improvement using line balancing technique. This project describes how to use line balance to save production time.Takt time and cycle time were computed with formula. The times were recorded and shorten by reducing downtime and wastes.As a result, the waiting time and total time taken were reduced.The time saved means the productivity can be increased with more time available. The waiting time has decreased around 50.81%, 50.98%, 50.76%, 50.55%, 50.88%, 50.68% and 50.77% for each extrusion machine. For each rewinding machine, the waiting time has decreased around 37.33%,36.55%, 36.12%, 35.45%, 34.86%, 34.18% and 35.76%. 2012-06 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/3748/1/KOH_CEK_SENG.PDF Cek Seng, Koh (2012) Line balancing technique implementation in a small and medium industry. Faculty of Manufacturing Engineering, Universiti Malaysia Pahang.
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic TS Manufactures
spellingShingle TS Manufactures
Cek Seng, Koh
Line balancing technique implementation in a small and medium industry
description The objective of this project is about the implementation of line balancing technique in a Small and Medium Industry.The implementation of line balancing in Automotive Industry has brought significant improvement to the plant's productivity.However,line balancing technique is not commonly used in Small and Medium Industry.The objective of this project is to simulate the line balancing technique and implement it in a Small and Medium Industry.The simulation was done using software called Arena where it gave overall picture of the future condition and analyze the result of production after improvement using line balancing technique. This project describes how to use line balance to save production time.Takt time and cycle time were computed with formula. The times were recorded and shorten by reducing downtime and wastes.As a result, the waiting time and total time taken were reduced.The time saved means the productivity can be increased with more time available. The waiting time has decreased around 50.81%, 50.98%, 50.76%, 50.55%, 50.88%, 50.68% and 50.77% for each extrusion machine. For each rewinding machine, the waiting time has decreased around 37.33%,36.55%, 36.12%, 35.45%, 34.86%, 34.18% and 35.76%.
format Undergraduates Project Papers
author Cek Seng, Koh
author_facet Cek Seng, Koh
author_sort Cek Seng, Koh
title Line balancing technique implementation in a small and medium industry
title_short Line balancing technique implementation in a small and medium industry
title_full Line balancing technique implementation in a small and medium industry
title_fullStr Line balancing technique implementation in a small and medium industry
title_full_unstemmed Line balancing technique implementation in a small and medium industry
title_sort line balancing technique implementation in a small and medium industry
publishDate 2012
url http://umpir.ump.edu.my/id/eprint/3748/1/KOH_CEK_SENG.PDF
http://umpir.ump.edu.my/id/eprint/3748/
_version_ 1705056932501389312
score 13.187197