Analyze the inefficient takt time production and high customer complaint for support wheel carrier component to improve Lean production system level at Autokeen Sdn.Bhd

This project presents a research to analyze the inefficient takt time production and high customer complaint for support wheel carrier part to improve level of Lean Production System (LPS) at Autokeen Sdn Bhd.The case study method has been conducted at Autokeen Sdn Bhd especially at support wheel ca...

Full description

Saved in:
Bibliographic Details
Main Author: Abd Rahman Fahmi, Mat Hasan
Format: Undergraduates Project Papers
Language:English
Published: 2012
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/3738/1/ABD_RAHMAN_FAHMI_BIN_MAT_HASAN.PDF
http://umpir.ump.edu.my/id/eprint/3738/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.3738
record_format eprints
spelling my.ump.umpir.37382021-07-12T03:31:01Z http://umpir.ump.edu.my/id/eprint/3738/ Analyze the inefficient takt time production and high customer complaint for support wheel carrier component to improve Lean production system level at Autokeen Sdn.Bhd Abd Rahman Fahmi, Mat Hasan TS Manufactures This project presents a research to analyze the inefficient takt time production and high customer complaint for support wheel carrier part to improve level of Lean Production System (LPS) at Autokeen Sdn Bhd.The case study method has been conducted at Autokeen Sdn Bhd especially at support wheel carrier workstation.The main purpose of this research is to give the recommendation to improve the takt production and customer complaint criteria in Autokeen LPS evaluation. From the research,the finding shows that the process cycle time for produce support wheel carrier is over the customer takt time.This problem because the customer takt time never being calculates and be display at support wheel carrier workstation. For the customer complaint criteria,many cases of defect part are delivering to customer because of man power carelessness.After all problems root causes being analyze the recommendation is given to improve the criteria of takt production and customer complaint. 2012-06 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/3738/1/ABD_RAHMAN_FAHMI_BIN_MAT_HASAN.PDF Abd Rahman Fahmi, Mat Hasan (2012) Analyze the inefficient takt time production and high customer complaint for support wheel carrier component to improve Lean production system level at Autokeen Sdn.Bhd. Faculty of Manufacturing Engineering, Universiti Malaysia Pahang.
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic TS Manufactures
spellingShingle TS Manufactures
Abd Rahman Fahmi, Mat Hasan
Analyze the inefficient takt time production and high customer complaint for support wheel carrier component to improve Lean production system level at Autokeen Sdn.Bhd
description This project presents a research to analyze the inefficient takt time production and high customer complaint for support wheel carrier part to improve level of Lean Production System (LPS) at Autokeen Sdn Bhd.The case study method has been conducted at Autokeen Sdn Bhd especially at support wheel carrier workstation.The main purpose of this research is to give the recommendation to improve the takt production and customer complaint criteria in Autokeen LPS evaluation. From the research,the finding shows that the process cycle time for produce support wheel carrier is over the customer takt time.This problem because the customer takt time never being calculates and be display at support wheel carrier workstation. For the customer complaint criteria,many cases of defect part are delivering to customer because of man power carelessness.After all problems root causes being analyze the recommendation is given to improve the criteria of takt production and customer complaint.
format Undergraduates Project Papers
author Abd Rahman Fahmi, Mat Hasan
author_facet Abd Rahman Fahmi, Mat Hasan
author_sort Abd Rahman Fahmi, Mat Hasan
title Analyze the inefficient takt time production and high customer complaint for support wheel carrier component to improve Lean production system level at Autokeen Sdn.Bhd
title_short Analyze the inefficient takt time production and high customer complaint for support wheel carrier component to improve Lean production system level at Autokeen Sdn.Bhd
title_full Analyze the inefficient takt time production and high customer complaint for support wheel carrier component to improve Lean production system level at Autokeen Sdn.Bhd
title_fullStr Analyze the inefficient takt time production and high customer complaint for support wheel carrier component to improve Lean production system level at Autokeen Sdn.Bhd
title_full_unstemmed Analyze the inefficient takt time production and high customer complaint for support wheel carrier component to improve Lean production system level at Autokeen Sdn.Bhd
title_sort analyze the inefficient takt time production and high customer complaint for support wheel carrier component to improve lean production system level at autokeen sdn.bhd
publishDate 2012
url http://umpir.ump.edu.my/id/eprint/3738/1/ABD_RAHMAN_FAHMI_BIN_MAT_HASAN.PDF
http://umpir.ump.edu.my/id/eprint/3738/
_version_ 1705056931475881984
score 13.154949