Key constraint in construction industry: A review

Constraint is a limitation of a situation, agency, or force that obstructs movement toward a goal or purpose. There are several sorts of constraints that might impact building projects. During the early phases of a project, constraints should be recognized and explained in as much detail as possible...

Full description

Saved in:
Bibliographic Details
Main Authors: Nurul Athirah, R., Doh, S. I.
Format: Article
Language:English
Published: Penerbit UMP 2022
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/36210/1/Key%20Constraint%20in%20Construction%20Industry.pdf
http://umpir.ump.edu.my/id/eprint/36210/
https://doi.org/10.15282/construction.v2i2.7779
https://doi.org/10.15282/construction.v2i2.7779
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.36210
record_format eprints
spelling my.ump.umpir.362102023-01-03T02:04:08Z http://umpir.ump.edu.my/id/eprint/36210/ Key constraint in construction industry: A review Nurul Athirah, R. Doh, S. I. TA Engineering (General). Civil engineering (General) TH Building construction Constraint is a limitation of a situation, agency, or force that obstructs movement toward a goal or purpose. There are several sorts of constraints that might impact building projects. During the early phases of a project, constraints should be recognized and explained in as much detail as possible, so that knowledge of them and their potential impact can be handled. The aim of this study is to identify types of constraints that might occur in the construction industry which may affect the time, cost and scope of the project. The study was carried out on the basis of a literature review with the result and findings of previous researchers. The result and findings from the previous researcher have been analysing in the table together with the method of analysis that being used by them in order to carry out the study. From the review, it can be summarized that the key of constraints can be divided into five major elements. There are Environmental constraints, Legal Constraints, Environmental Constraints, Technical Constraints and Social Constraints. Therefore, by doing this investigation, it will help to give a better solution and performance in term of time, cost and scope of the project by classifying and limiting the constraints in the construction industry especially at an early stage in the project planning and schedule. Penerbit UMP 2022-12 Article PeerReviewed pdf en cc_by_4 http://umpir.ump.edu.my/id/eprint/36210/1/Key%20Constraint%20in%20Construction%20Industry.pdf Nurul Athirah, R. and Doh, S. I. (2022) Key constraint in construction industry: A review. Construction, 2 (2). pp. 1-6. ISSN 2785-8731 https://doi.org/10.15282/construction.v2i2.7779 https://doi.org/10.15282/construction.v2i2.7779
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic TA Engineering (General). Civil engineering (General)
TH Building construction
spellingShingle TA Engineering (General). Civil engineering (General)
TH Building construction
Nurul Athirah, R.
Doh, S. I.
Key constraint in construction industry: A review
description Constraint is a limitation of a situation, agency, or force that obstructs movement toward a goal or purpose. There are several sorts of constraints that might impact building projects. During the early phases of a project, constraints should be recognized and explained in as much detail as possible, so that knowledge of them and their potential impact can be handled. The aim of this study is to identify types of constraints that might occur in the construction industry which may affect the time, cost and scope of the project. The study was carried out on the basis of a literature review with the result and findings of previous researchers. The result and findings from the previous researcher have been analysing in the table together with the method of analysis that being used by them in order to carry out the study. From the review, it can be summarized that the key of constraints can be divided into five major elements. There are Environmental constraints, Legal Constraints, Environmental Constraints, Technical Constraints and Social Constraints. Therefore, by doing this investigation, it will help to give a better solution and performance in term of time, cost and scope of the project by classifying and limiting the constraints in the construction industry especially at an early stage in the project planning and schedule.
format Article
author Nurul Athirah, R.
Doh, S. I.
author_facet Nurul Athirah, R.
Doh, S. I.
author_sort Nurul Athirah, R.
title Key constraint in construction industry: A review
title_short Key constraint in construction industry: A review
title_full Key constraint in construction industry: A review
title_fullStr Key constraint in construction industry: A review
title_full_unstemmed Key constraint in construction industry: A review
title_sort key constraint in construction industry: a review
publisher Penerbit UMP
publishDate 2022
url http://umpir.ump.edu.my/id/eprint/36210/1/Key%20Constraint%20in%20Construction%20Industry.pdf
http://umpir.ump.edu.my/id/eprint/36210/
https://doi.org/10.15282/construction.v2i2.7779
https://doi.org/10.15282/construction.v2i2.7779
_version_ 1753971874997469184
score 13.160551