Comparison of methods to estimate missing rainfall data for short term period at UMP Gambang
Hydrological analysis is crucial for planning or designing engineering structures and water resources system as stated by World Meteorological Organization (WMO). A long and complete data set of rainfall is required in order to carry out the hydrological study successfully. However, the most common...
Saved in:
Main Authors: | A. A. G., Nadiatul Adilah, H., Hannani |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
IOP Publishing Ltd
2021
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/35417/1/Comparison%20of%20methods%20to%20estimate%20missing%20rainfall%20data%20for%20short%20term%20period%20at%20ump%20gambang.pdf http://umpir.ump.edu.my/id/eprint/35417/ https://doi.org/10.1088/1755-1315/682/1/012027 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Hydrology study and trend of rainfall event at UMP Gambang
by: Muhammad Amirudin, Shikh Ali
Published: (2015) -
Rainfall trend analysis using box plot method: case study UMP Campus Gambang and Pekan
by: Nadiatul Adilah, Ahmad Abdul Ghani, et al.
Published: (2020) -
The development of rainfall temporal pattern in Gambang
by: Nursyafiqah Amira, Ahmad Zaimi
Published: (2019) -
Comparison of missing rainfall data treatment analysis at Kenyir Lake
by: Azreen Harina, Azman, et al.
Published: (2021) -
The relationship between rainfall characteristic and total suspended solid (TSS) of stormwater in UMP Gambang
by: Noor Farahazwani, Che Noh
Published: (2017)