Modelling success factors influencing industrialized building system project performance using dematel
Industrialized Building System (IBS) is the term to represent the prefabrication concept in the Malaysian construction industry that uses standardized building components mass produced in a factory or on the site. Adoption of IBS in Malaysia in still very low whereby only 10% of total awarded projec...
保存先:
第一著者: | Yusmin, Jaffar |
---|---|
フォーマット: | 学位論文 |
言語: | English |
出版事項: |
2021
|
主題: | |
オンライン・アクセス: | http://umpir.ump.edu.my/id/eprint/35289/1/Modelling%20success%20factors%20influencing%20industrialized%20building%20system%20project%20performance%20using%20dematel.wm.pdf http://umpir.ump.edu.my/id/eprint/35289/ |
タグ: |
タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
|
類似資料
-
Critical Success Factors for Stakeholder Engagement in Renewable Energy Projects of Malaysia
著者:: Zarith Sufia, Azlan, 等
出版事項: (2019) -
Essential Characteristics Of A Successful Construction Project Manager In The Malaysian Construction Industry
著者:: Chang, Khong Thong
出版事項: (2019) -
Renewable energy project success in malaysia: the influence of stakeholder engagement indicators with the moderating effect of renewable energy policy implementation
著者:: Zarith Sufia, Azlan
出版事項: (2022) -
The impacts of the university policies during covid-19 pandemic towards academic operation, financial, facilities and staff operation in universiti malaysia pahang: A dematel based model
著者:: Azrizulazmi, Bustan
出版事項: (2022) -
Critical Risk Factors in Construction Projects: A Dematel-Based Model
著者:: Lee, Chia Kuang, 等
出版事項: (2023)