Modelling success factors influencing industrialized building system project performance using dematel
Industrialized Building System (IBS) is the term to represent the prefabrication concept in the Malaysian construction industry that uses standardized building components mass produced in a factory or on the site. Adoption of IBS in Malaysia in still very low whereby only 10% of total awarded projec...
Saved in:
Main Author: | Yusmin, Jaffar |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2021
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/35289/1/Modelling%20success%20factors%20influencing%20industrialized%20building%20system%20project%20performance%20using%20dematel.wm.pdf http://umpir.ump.edu.my/id/eprint/35289/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Critical Success Factors for Stakeholder Engagement in Renewable Energy Projects of Malaysia
by: Zarith Sufia, Azlan, et al.
Published: (2019) -
Essential Characteristics Of A Successful Construction Project Manager In The Malaysian Construction Industry
by: Chang, Khong Thong
Published: (2019) -
Renewable energy project success in malaysia: the influence of stakeholder engagement indicators with the moderating effect of renewable energy policy implementation
by: Zarith Sufia, Azlan
Published: (2022) -
The impacts of the university policies during covid-19 pandemic towards academic operation, financial, facilities and staff operation in universiti malaysia pahang: A dematel based model
by: Azrizulazmi, Bustan
Published: (2022) -
Critical Success Factors in the Development Of the KLIA Aeropolis
by: Chee, Chow Liu
Published: (2019)