Implementation of ordering kanban for supplier at company Proreka (M) Sdn Bhd

Lean Production System is a manufacturing management in which time can be shortened for customer order and delivery time; and service parts order can be increased through the elimination of all forms of waste. The main component for “Just-In-Time”, one of the pillars of Lean production System is &qu...

Full description

Saved in:
Bibliographic Details
Main Author: Lim, Qian Bing
Format: Undergraduates Project Papers
Language:English
Published: 2012
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/3479/1/cd6278_99.pdf
http://umpir.ump.edu.my/id/eprint/3479/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.3479
record_format eprints
spelling my.ump.umpir.34792021-09-14T03:56:45Z http://umpir.ump.edu.my/id/eprint/3479/ Implementation of ordering kanban for supplier at company Proreka (M) Sdn Bhd Lim, Qian Bing TS Manufactures Lean Production System is a manufacturing management in which time can be shortened for customer order and delivery time; and service parts order can be increased through the elimination of all forms of waste. The main component for “Just-In-Time”, one of the pillars of Lean production System is "Pull System" or Kanban System. Kanban system is a pull system of inventory control that typically uses cards or bins to signal when materials or work-in-process should be moved forward; stock inventory is moved through production stages only when it is needed,and minimizing stock inventories. This is an important revolution in the concept of the Lean Production System. The objective of this research is to simulate Kanban policies for three major materials in warehouse of Proreka (M) Sdn Bhd which is a Malaysia Tier-1 vendor and manufacturer of automotive components. Another objective is to investigate the stock control efficiencies between Material Requirement Planning and Kanban System. The main target of this research is to implement small lot ordering by using Kanban policy to reduce the stock inventories. A simulation model of delivery frequency was developed for the replenishment process of the selected stocks to analyse the delivery frequency from supplier after Kanban implementation. The average stock holding before and after Kanban implementation was analysed to compare the stock control effectiveness between Material Requirement Planning and Kanban System. Interview session and survey by questionnaire were conducted to analyse the performance of Kanban System in point of view of employees. The result obtained indicated that Kanban policy can reduce stock inventories and improve the efficiency in stock control. Other significant improvements with the implementation of Kanban are such as physical condition of the manufacturing environment, production efficiency, and motivation of workers. 2012-06 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/3479/1/cd6278_99.pdf Lim, Qian Bing (2012) Implementation of ordering kanban for supplier at company Proreka (M) Sdn Bhd. Faculty of Manufacturing Engineering, Universiti Malaysia Pahang.
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic TS Manufactures
spellingShingle TS Manufactures
Lim, Qian Bing
Implementation of ordering kanban for supplier at company Proreka (M) Sdn Bhd
description Lean Production System is a manufacturing management in which time can be shortened for customer order and delivery time; and service parts order can be increased through the elimination of all forms of waste. The main component for “Just-In-Time”, one of the pillars of Lean production System is "Pull System" or Kanban System. Kanban system is a pull system of inventory control that typically uses cards or bins to signal when materials or work-in-process should be moved forward; stock inventory is moved through production stages only when it is needed,and minimizing stock inventories. This is an important revolution in the concept of the Lean Production System. The objective of this research is to simulate Kanban policies for three major materials in warehouse of Proreka (M) Sdn Bhd which is a Malaysia Tier-1 vendor and manufacturer of automotive components. Another objective is to investigate the stock control efficiencies between Material Requirement Planning and Kanban System. The main target of this research is to implement small lot ordering by using Kanban policy to reduce the stock inventories. A simulation model of delivery frequency was developed for the replenishment process of the selected stocks to analyse the delivery frequency from supplier after Kanban implementation. The average stock holding before and after Kanban implementation was analysed to compare the stock control effectiveness between Material Requirement Planning and Kanban System. Interview session and survey by questionnaire were conducted to analyse the performance of Kanban System in point of view of employees. The result obtained indicated that Kanban policy can reduce stock inventories and improve the efficiency in stock control. Other significant improvements with the implementation of Kanban are such as physical condition of the manufacturing environment, production efficiency, and motivation of workers.
format Undergraduates Project Papers
author Lim, Qian Bing
author_facet Lim, Qian Bing
author_sort Lim, Qian Bing
title Implementation of ordering kanban for supplier at company Proreka (M) Sdn Bhd
title_short Implementation of ordering kanban for supplier at company Proreka (M) Sdn Bhd
title_full Implementation of ordering kanban for supplier at company Proreka (M) Sdn Bhd
title_fullStr Implementation of ordering kanban for supplier at company Proreka (M) Sdn Bhd
title_full_unstemmed Implementation of ordering kanban for supplier at company Proreka (M) Sdn Bhd
title_sort implementation of ordering kanban for supplier at company proreka (m) sdn bhd
publishDate 2012
url http://umpir.ump.edu.my/id/eprint/3479/1/cd6278_99.pdf
http://umpir.ump.edu.my/id/eprint/3479/
_version_ 1712285301464891392
score 13.154949