Analysis and countermeasure to improve a low takt production item based on LPS evaluation at Hicom Teck See Sdn. Bhd.

Toyota Production System (TPS) is derived from Toyota's original idea was just in time (JIT) which it is the idea of sakiichi Toyoda, Toyoda kinchiri their engineers, taiichi Ohno. Objective of this system is to design out a muda (waste), mura (inconsistency) and muri (work load). In Malaysia t...

Full description

Saved in:
Bibliographic Details
Main Author: Muhammad Quyyum, Sohaimi
Format: Undergraduates Project Papers
Language:English
Published: 2012
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/3459/1/cd6260_90.pdf
http://umpir.ump.edu.my/id/eprint/3459/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.3459
record_format eprints
spelling my.ump.umpir.34592021-09-14T03:59:43Z http://umpir.ump.edu.my/id/eprint/3459/ Analysis and countermeasure to improve a low takt production item based on LPS evaluation at Hicom Teck See Sdn. Bhd. Muhammad Quyyum, Sohaimi TS Manufactures Toyota Production System (TPS) is derived from Toyota's original idea was just in time (JIT) which it is the idea of sakiichi Toyoda, Toyoda kinchiri their engineers, taiichi Ohno. Objective of this system is to design out a muda (waste), mura (inconsistency) and muri (work load). In Malaysia this system at first adopted in the automotive industry, especially in Proton and Perodua as well as their vendors. Hicom Teck See (M) Sdn. Bhd. is one of the Proton and Perodua vendors that produce parts made from plastic as the front bumper. From the results of evaluation of LPS in May 2011, Takt Production showed the lowest criteria, in order to solve this problem one of the seven QC tools are used, next by used CFMEA and FMEA for determined the potential of the root causes why the production is the lowest criteria. By obtaining these potentials occur this problem, suggestions for improving these criteria are shown. By taking one of the products produced Hicom Teck See, a case study have been done. For this case study, a visits to Hicom Teck See have been done, all data on these products is taken to produce a proposal. The proposal is expected to improve Takt production criteria, and thus increase the score assessment of LPS in the next evaluation. By prepare proposals, Hicom Teck can see self-improvement / kaizen at work stations to reduce the lead time to customers and reduce the workload on the operator. 2012-06 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/3459/1/cd6260_90.pdf Muhammad Quyyum, Sohaimi (2012) Analysis and countermeasure to improve a low takt production item based on LPS evaluation at Hicom Teck See Sdn. Bhd. Faculty of Manufacturing Engineering, Universiti Malaysia Pahang.
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic TS Manufactures
spellingShingle TS Manufactures
Muhammad Quyyum, Sohaimi
Analysis and countermeasure to improve a low takt production item based on LPS evaluation at Hicom Teck See Sdn. Bhd.
description Toyota Production System (TPS) is derived from Toyota's original idea was just in time (JIT) which it is the idea of sakiichi Toyoda, Toyoda kinchiri their engineers, taiichi Ohno. Objective of this system is to design out a muda (waste), mura (inconsistency) and muri (work load). In Malaysia this system at first adopted in the automotive industry, especially in Proton and Perodua as well as their vendors. Hicom Teck See (M) Sdn. Bhd. is one of the Proton and Perodua vendors that produce parts made from plastic as the front bumper. From the results of evaluation of LPS in May 2011, Takt Production showed the lowest criteria, in order to solve this problem one of the seven QC tools are used, next by used CFMEA and FMEA for determined the potential of the root causes why the production is the lowest criteria. By obtaining these potentials occur this problem, suggestions for improving these criteria are shown. By taking one of the products produced Hicom Teck See, a case study have been done. For this case study, a visits to Hicom Teck See have been done, all data on these products is taken to produce a proposal. The proposal is expected to improve Takt production criteria, and thus increase the score assessment of LPS in the next evaluation. By prepare proposals, Hicom Teck can see self-improvement / kaizen at work stations to reduce the lead time to customers and reduce the workload on the operator.
format Undergraduates Project Papers
author Muhammad Quyyum, Sohaimi
author_facet Muhammad Quyyum, Sohaimi
author_sort Muhammad Quyyum, Sohaimi
title Analysis and countermeasure to improve a low takt production item based on LPS evaluation at Hicom Teck See Sdn. Bhd.
title_short Analysis and countermeasure to improve a low takt production item based on LPS evaluation at Hicom Teck See Sdn. Bhd.
title_full Analysis and countermeasure to improve a low takt production item based on LPS evaluation at Hicom Teck See Sdn. Bhd.
title_fullStr Analysis and countermeasure to improve a low takt production item based on LPS evaluation at Hicom Teck See Sdn. Bhd.
title_full_unstemmed Analysis and countermeasure to improve a low takt production item based on LPS evaluation at Hicom Teck See Sdn. Bhd.
title_sort analysis and countermeasure to improve a low takt production item based on lps evaluation at hicom teck see sdn. bhd.
publishDate 2012
url http://umpir.ump.edu.my/id/eprint/3459/1/cd6260_90.pdf
http://umpir.ump.edu.my/id/eprint/3459/
_version_ 1712285299766198272
score 13.160551