Interrelation matrix of process knowledge management element with other risk based process safety elements
Risk Based Process Safety (RBPS) guideline has been established with four pillars that consist of 20 elements to help organisations design and implement effective Process Safety Management (PSM) systems. RBPS have 20 elements built and expanded upon the original 12 elements from OSHA PSM standard. P...
Saved in:
Main Authors: | Nur Izzati, Pakhor Anuar, Hanida, Abdul Aziz |
---|---|
Format: | Conference or Workshop Item |
Language: | English English English |
Published: |
Penerbit UMP
2020
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/34332/1/Nur%20Izzati%20%28MTS19001%29_NCON-PGR%202020.pdf http://umpir.ump.edu.my/id/eprint/34332/2/Interrelation%20matrix%20of%20process%20knowledge%20management%20element%20.pdf http://umpir.ump.edu.my/id/eprint/34332/3/CHAPTER%205-Interrelation%20matrix%20of%20process%20knowledge%20management%20element.pdf http://umpir.ump.edu.my/id/eprint/34332/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Integrated chemical, technology & equipment process knowledge management system based on risk based process safety
by: Nur Izzati, Pakhor Anuar, et al.
Published: (2019) -
Interrelations between process safety management elements
by: Aziz, Hanida Abdul, et al.
Published: (2017) -
Interrelations between process safety management elements
by: Aziz, Hanida Abdul, et al.
Published: (2017) -
Interrelations between process safety management elements
by: Aziz, H.A., et al.
Published: (2017) -
Interrelations Between Process Safety Management Elements
by: Mohd Shariff, Azmi
Published: (2017)