Supply chain lead time reduction in a pharmaceutical production warehouse – a case study
Purpose The purpose of this study is to apply value stream mapping (VSM) in Malaysian pharmaceutical production warehouse. A current and future state value stream map from the raw material receiving end to the production unit was developed to find out waste and unwanted lead time. It was very much...
Saved in:
Main Authors: | , |
---|---|
格式: | Article |
语言: | English |
出版: |
Amerald
2019
|
主题: | |
在线阅读: | http://umpir.ump.edu.my/id/eprint/28437/1/Supply%20chain%20lead%20time%20reduction%20in%20a%20pharmaceutical1.pdf http://umpir.ump.edu.my/id/eprint/28437/ https://doi.org/10.1108/IJPHM-02-2019-0005 https://doi.org/10.1108/IJPHM-02-2019-0005 |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|