Supply chain lead time reduction in a pharmaceutical production warehouse – a case study
Purpose The purpose of this study is to apply value stream mapping (VSM) in Malaysian pharmaceutical production warehouse. A current and future state value stream map from the raw material receiving end to the production unit was developed to find out waste and unwanted lead time. It was very much...
Saved in:
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Amerald
2019
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/28437/1/Supply%20chain%20lead%20time%20reduction%20in%20a%20pharmaceutical1.pdf http://umpir.ump.edu.my/id/eprint/28437/ https://doi.org/10.1108/IJPHM-02-2019-0005 https://doi.org/10.1108/IJPHM-02-2019-0005 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.ump.umpir.28437 |
---|---|
record_format |
eprints |
spelling |
my.ump.umpir.284372020-06-15T06:48:36Z http://umpir.ump.edu.my/id/eprint/28437/ Supply chain lead time reduction in a pharmaceutical production warehouse – a case study Ahmed Zainul, Abideen Fazeeda, Mohamad HD Industries. Land use. Labor Purpose The purpose of this study is to apply value stream mapping (VSM) in Malaysian pharmaceutical production warehouse. A current and future state value stream map from the raw material receiving end to the production unit was developed to find out waste and unwanted lead time. It was very much essential to cut down the supply chain lead time at the initial phase as the raw material unloading, sorting, temporary storage and dispatch to production were seen contributing to a huge lead time build-up. Amerald 2019 Article PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/28437/1/Supply%20chain%20lead%20time%20reduction%20in%20a%20pharmaceutical1.pdf Ahmed Zainul, Abideen and Fazeeda, Mohamad (2019) Supply chain lead time reduction in a pharmaceutical production warehouse – a case study. International Journal of Pharmaceutical and Healthcare Marketing, 14 (1). pp. 61-88. ISSN 1750-6123 https://doi.org/10.1108/IJPHM-02-2019-0005 https://doi.org/10.1108/IJPHM-02-2019-0005 |
institution |
Universiti Malaysia Pahang |
building |
UMP Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Pahang |
content_source |
UMP Institutional Repository |
url_provider |
http://umpir.ump.edu.my/ |
language |
English |
topic |
HD Industries. Land use. Labor |
spellingShingle |
HD Industries. Land use. Labor Ahmed Zainul, Abideen Fazeeda, Mohamad Supply chain lead time reduction in a pharmaceutical production warehouse – a case study |
description |
Purpose
The purpose of this study is to apply value stream mapping (VSM) in Malaysian pharmaceutical production warehouse. A current and future state value stream map from the raw material receiving end to the production unit was developed to find out waste and unwanted lead time. It was very much essential to cut down the supply chain lead time at the initial phase as the raw material unloading, sorting, temporary storage and dispatch to production were seen contributing to a huge lead time build-up. |
format |
Article |
author |
Ahmed Zainul, Abideen Fazeeda, Mohamad |
author_facet |
Ahmed Zainul, Abideen Fazeeda, Mohamad |
author_sort |
Ahmed Zainul, Abideen |
title |
Supply chain lead time reduction in a pharmaceutical production warehouse – a case study |
title_short |
Supply chain lead time reduction in a pharmaceutical production warehouse – a case study |
title_full |
Supply chain lead time reduction in a pharmaceutical production warehouse – a case study |
title_fullStr |
Supply chain lead time reduction in a pharmaceutical production warehouse – a case study |
title_full_unstemmed |
Supply chain lead time reduction in a pharmaceutical production warehouse – a case study |
title_sort |
supply chain lead time reduction in a pharmaceutical production warehouse – a case study |
publisher |
Amerald |
publishDate |
2019 |
url |
http://umpir.ump.edu.my/id/eprint/28437/1/Supply%20chain%20lead%20time%20reduction%20in%20a%20pharmaceutical1.pdf http://umpir.ump.edu.my/id/eprint/28437/ https://doi.org/10.1108/IJPHM-02-2019-0005 https://doi.org/10.1108/IJPHM-02-2019-0005 |
_version_ |
1672610895914598400 |
score |
13.154949 |