Supply chain lead time reduction in a pharmaceutical production warehouse – a case study
Purpose The purpose of this study is to apply value stream mapping (VSM) in Malaysian pharmaceutical production warehouse. A current and future state value stream map from the raw material receiving end to the production unit was developed to find out waste and unwanted lead time. It was very much...
保存先:
主要な著者: | , |
---|---|
フォーマット: | 論文 |
言語: | English |
出版事項: |
Amerald
2019
|
主題: | |
オンライン・アクセス: | http://umpir.ump.edu.my/id/eprint/28437/1/Supply%20chain%20lead%20time%20reduction%20in%20a%20pharmaceutical1.pdf http://umpir.ump.edu.my/id/eprint/28437/ https://doi.org/10.1108/IJPHM-02-2019-0005 https://doi.org/10.1108/IJPHM-02-2019-0005 |
タグ: |
タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
|