Supply chain lead time reduction in a pharmaceutical production warehouse – a case study
Purpose The purpose of this study is to apply value stream mapping (VSM) in Malaysian pharmaceutical production warehouse. A current and future state value stream map from the raw material receiving end to the production unit was developed to find out waste and unwanted lead time. It was very much...
محفوظ في:
المؤلفون الرئيسيون: | , |
---|---|
التنسيق: | مقال |
اللغة: | English |
منشور في: |
Amerald
2019
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://umpir.ump.edu.my/id/eprint/28437/1/Supply%20chain%20lead%20time%20reduction%20in%20a%20pharmaceutical1.pdf http://umpir.ump.edu.my/id/eprint/28437/ https://doi.org/10.1108/IJPHM-02-2019-0005 https://doi.org/10.1108/IJPHM-02-2019-0005 |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|