User requirement validation: challenge exploration in pre-project execution

The need for validation technique for user requirement or in other term Tender Specification at the Request for Tender (RFT) is vital. Without much resource for vendor to dispose of, the outcome of this research will proof useful. The purpose of this article is to determine the gap of initial and fi...

Full description

Saved in:
Bibliographic Details
Main Authors: Muhamad Idaham, Umar Ong, M. A., Ameedeen
Format: Conference or Workshop Item
Language:English
Published: IOP Publishing Ltd 2020
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/27726/13/User%20Requirement%20Validation%20Challenge.pdf
http://umpir.ump.edu.my/id/eprint/27726/
https://doi.org/10.1088/1757-899X/769/1/012050
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.27726
record_format eprints
spelling my.ump.umpir.277262021-10-14T07:52:36Z http://umpir.ump.edu.my/id/eprint/27726/ User requirement validation: challenge exploration in pre-project execution Muhamad Idaham, Umar Ong M. A., Ameedeen QA76 Computer software The need for validation technique for user requirement or in other term Tender Specification at the Request for Tender (RFT) is vital. Without much resource for vendor to dispose of, the outcome of this research will proof useful. The purpose of this article is to determine the gap of initial and finish software product, method of eliminate or mitigate those gaps, list of OO artefacts and their relevancy towards the research. Finding of this article will be the basis of interconnecting user requirement specification and metarequirement via UML. Based on the result, RE plays an important role in the survivability of a project, there are a few researches being done for solutions in the field of RFT specification validation, UML is the most relevant artefacts and usability of UML diagram ranked based on consistency is relevant toward connecting UML and meta-requirement. It is suggested that further research is to be carried out that will define the connection between user requirement specification in the form of UML to meta-requirement in order to achieve the overall objective of the research. IOP Publishing Ltd 2020-02 Conference or Workshop Item PeerReviewed pdf en cc_by http://umpir.ump.edu.my/id/eprint/27726/13/User%20Requirement%20Validation%20Challenge.pdf Muhamad Idaham, Umar Ong and M. A., Ameedeen (2020) User requirement validation: challenge exploration in pre-project execution. In: IOP Conference Series: Materials Science and Engineering, The 6th International Conference on Software Engineering & Computer Systems, 25-27 September 2019 , Pahang, Malaysia. pp. 1-16., 769 (012050). ISSN 1757-8981 (Print); 1757-899X (Online) https://doi.org/10.1088/1757-899X/769/1/012050
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic QA76 Computer software
spellingShingle QA76 Computer software
Muhamad Idaham, Umar Ong
M. A., Ameedeen
User requirement validation: challenge exploration in pre-project execution
description The need for validation technique for user requirement or in other term Tender Specification at the Request for Tender (RFT) is vital. Without much resource for vendor to dispose of, the outcome of this research will proof useful. The purpose of this article is to determine the gap of initial and finish software product, method of eliminate or mitigate those gaps, list of OO artefacts and their relevancy towards the research. Finding of this article will be the basis of interconnecting user requirement specification and metarequirement via UML. Based on the result, RE plays an important role in the survivability of a project, there are a few researches being done for solutions in the field of RFT specification validation, UML is the most relevant artefacts and usability of UML diagram ranked based on consistency is relevant toward connecting UML and meta-requirement. It is suggested that further research is to be carried out that will define the connection between user requirement specification in the form of UML to meta-requirement in order to achieve the overall objective of the research.
format Conference or Workshop Item
author Muhamad Idaham, Umar Ong
M. A., Ameedeen
author_facet Muhamad Idaham, Umar Ong
M. A., Ameedeen
author_sort Muhamad Idaham, Umar Ong
title User requirement validation: challenge exploration in pre-project execution
title_short User requirement validation: challenge exploration in pre-project execution
title_full User requirement validation: challenge exploration in pre-project execution
title_fullStr User requirement validation: challenge exploration in pre-project execution
title_full_unstemmed User requirement validation: challenge exploration in pre-project execution
title_sort user requirement validation: challenge exploration in pre-project execution
publisher IOP Publishing Ltd
publishDate 2020
url http://umpir.ump.edu.my/id/eprint/27726/13/User%20Requirement%20Validation%20Challenge.pdf
http://umpir.ump.edu.my/id/eprint/27726/
https://doi.org/10.1088/1757-899X/769/1/012050
_version_ 1715189865000206336
score 13.19449