Selection of contractor using analytical hierarchy process (AHP)

Construction projects are now progressing rapidly in Malaysia and have been as one of an important factor in contributing increasing economic country. Because of that, contractor selection is an important aspect in construction sector especially for client or parties involve that need to hire the be...

Full description

Saved in:
Bibliographic Details
Main Author: Nurul Syafiqah, Zaini
Format: Undergraduates Project Papers
Language:English
Published: 2018
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/27667/1/Selection%20of%20contractor%20using%20analytical%20hierarchy%20process.pdf
http://umpir.ump.edu.my/id/eprint/27667/
https://efind.ump.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=90944
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.27667
record_format eprints
spelling my.ump.umpir.276672020-02-03T06:50:34Z http://umpir.ump.edu.my/id/eprint/27667/ Selection of contractor using analytical hierarchy process (AHP) Nurul Syafiqah, Zaini TA Engineering (General). Civil engineering (General) Construction projects are now progressing rapidly in Malaysia and have been as one of an important factor in contributing increasing economic country. Because of that, contractor selection is an important aspect in construction sector especially for client or parties involve that need to hire the best contractor to manage and complete their project within time and cost given also with good quality. Furthermore, without a suitable method use in selection of contractor, it for sure will affect the completion of whole project. In this study, I am doing research about the use of the analytical hierarchy process (AHP) as a decision support model to select contractor. The AHP allows constructing decision as hierarchies and each criterion can be evaluated through weighted determined by the expert in construction field. The purpose of this study is to develop the main criteria used by client in selection of contractors also identify the weighted criteria by using AHP method from current practice in Malaysia. Besides, this method is one of the decision-making that is necessary to eliminate the risks of project failure due to poor contractor’s performance. 2018-06 Undergraduates Project Papers NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/27667/1/Selection%20of%20contractor%20using%20analytical%20hierarchy%20process.pdf Nurul Syafiqah, Zaini (2018) Selection of contractor using analytical hierarchy process (AHP). Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang. https://efind.ump.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=90944
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Nurul Syafiqah, Zaini
Selection of contractor using analytical hierarchy process (AHP)
description Construction projects are now progressing rapidly in Malaysia and have been as one of an important factor in contributing increasing economic country. Because of that, contractor selection is an important aspect in construction sector especially for client or parties involve that need to hire the best contractor to manage and complete their project within time and cost given also with good quality. Furthermore, without a suitable method use in selection of contractor, it for sure will affect the completion of whole project. In this study, I am doing research about the use of the analytical hierarchy process (AHP) as a decision support model to select contractor. The AHP allows constructing decision as hierarchies and each criterion can be evaluated through weighted determined by the expert in construction field. The purpose of this study is to develop the main criteria used by client in selection of contractors also identify the weighted criteria by using AHP method from current practice in Malaysia. Besides, this method is one of the decision-making that is necessary to eliminate the risks of project failure due to poor contractor’s performance.
format Undergraduates Project Papers
author Nurul Syafiqah, Zaini
author_facet Nurul Syafiqah, Zaini
author_sort Nurul Syafiqah, Zaini
title Selection of contractor using analytical hierarchy process (AHP)
title_short Selection of contractor using analytical hierarchy process (AHP)
title_full Selection of contractor using analytical hierarchy process (AHP)
title_fullStr Selection of contractor using analytical hierarchy process (AHP)
title_full_unstemmed Selection of contractor using analytical hierarchy process (AHP)
title_sort selection of contractor using analytical hierarchy process (ahp)
publishDate 2018
url http://umpir.ump.edu.my/id/eprint/27667/1/Selection%20of%20contractor%20using%20analytical%20hierarchy%20process.pdf
http://umpir.ump.edu.my/id/eprint/27667/
https://efind.ump.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=90944
_version_ 1662754778822737920
score 13.18916