Using mediation in project disputes based on theory of planned behavior and technology acceptance model
The construction industry has been afflicted by various contractual issues. Alternative dispute resolution (ADR) methods such as arbitration, mediation, expert review, and adjudication techniques have been used to resolve construction disputes effectively. However, among these types of ADR methods,...
保存先:
主要な著者: | Lee, Chia Kuang, Lee, Mei Sin, Thurasamy, Ramayah |
---|---|
フォーマット: | 論文 |
言語: | English |
出版事項: |
American Society of Civil Engineers (ASCE)
2020
|
主題: | |
オンライン・アクセス: | http://umpir.ump.edu.my/id/eprint/27243/1/Using%20mediation%20in%20project%20disputes%20based%20on%20theory%20.pdf http://umpir.ump.edu.my/id/eprint/27243/ https://doi.org/10.1061/(ASCE)LA.1943-4170.0000361 https://doi.org/10.1061/(ASCE)LA.1943-4170.0000361 |
タグ: |
タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
|
類似資料
-
Dispute resolution in relation to delay of construction project
著者:: Soon, Tan Kian
出版事項: (2010) -
Predicting intention to use alternative dispute resolution (ADR): an empirical test of theory of planned behaviour (TPB) model
著者:: Lee, Chia Kuang, 等
出版事項: (2018) -
Minimising construction disputes
著者:: Wahi, Noraziah
出版事項: (2008) -
The profile of construction disputes
著者:: Abidin, Asniah
出版事項: (2007) -
Prioritization of Factors Influencing Safety Performance on Construction Sites: A Study Based on Grade Seven (G7) Main Contractors' Perspectives
著者:: Lee, Chia Kuang, 等
出版事項: (2013)