Load shedding scheme based on frequency and voltage stability for an islanding operation of a distribution network connected to mini-hydro generation

This paper presents a load shedding scheme (LSS) based on system frequency and voltage stability (VS). In the proposed scheme, the amount of power imbalance is determined using a rate of change of frequency, and the load shedding priority is carried out based on a VS index. The load with the highest...

Full description

Saved in:
Bibliographic Details
Main Authors: Norazliani, Md Sapari, Hazlie, Mokhlis, Javed, Ahmed Laghari, Halim, Abu Bakar, Hasmaini, Mohamad, Mohd Rohaimi, Mohd Dahalan
Format: Article
Language:English
Published: Turkiye Klinikleri Journal of Medical Sciences 2016
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/27025/1/Load%20shedding%20scheme%20based%20on%20frequency%20and%20voltage.pdf
http://umpir.ump.edu.my/id/eprint/27025/
https://doi.org/10.3906/elk-1601-111
https://doi.org/10.3906/elk-1601-111
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.27025
record_format eprints
spelling my.ump.umpir.270252020-03-23T03:10:54Z http://umpir.ump.edu.my/id/eprint/27025/ Load shedding scheme based on frequency and voltage stability for an islanding operation of a distribution network connected to mini-hydro generation Norazliani, Md Sapari Hazlie, Mokhlis Javed, Ahmed Laghari Halim, Abu Bakar Hasmaini, Mohamad Mohd Rohaimi, Mohd Dahalan T Technology (General) TK Electrical engineering. Electronics Nuclear engineering TP Chemical technology This paper presents a load shedding scheme (LSS) based on system frequency and voltage stability (VS). In the proposed scheme, the amount of power imbalance is determined using a rate of change of frequency, and the load shedding priority is carried out based on a VS index. The load with the highest tendency for voltage collapse (based on the index value) is given first priority to be shed. Thus, by shedding the most sensitive load, the distribution system can be saved from power collapse and then the system can return to its nominal state after load shedding. The proposed LSS is validated through simulation using PSCAD/EMTDC software on a Malaysian distribution network that consists of two mini-hydro generators. The simulation results show that the proposed scheme manages to shed the optimal amount of load when compared to conventional and adaptive frequency LSS. Moreover, apart from frequency stability, the proposed scheme also shows a significant improvement in the voltage profile of the islanded system. Turkiye Klinikleri Journal of Medical Sciences 2016-07-07 Article PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/27025/1/Load%20shedding%20scheme%20based%20on%20frequency%20and%20voltage.pdf Norazliani, Md Sapari and Hazlie, Mokhlis and Javed, Ahmed Laghari and Halim, Abu Bakar and Hasmaini, Mohamad and Mohd Rohaimi, Mohd Dahalan (2016) Load shedding scheme based on frequency and voltage stability for an islanding operation of a distribution network connected to mini-hydro generation. Turkish Journal of Electrical Engineering and Computer Sciences, 25 (3). pp. 1852-1863. ISSN 1300-0632 https://doi.org/10.3906/elk-1601-111 https://doi.org/10.3906/elk-1601-111
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic T Technology (General)
TK Electrical engineering. Electronics Nuclear engineering
TP Chemical technology
spellingShingle T Technology (General)
TK Electrical engineering. Electronics Nuclear engineering
TP Chemical technology
Norazliani, Md Sapari
Hazlie, Mokhlis
Javed, Ahmed Laghari
Halim, Abu Bakar
Hasmaini, Mohamad
Mohd Rohaimi, Mohd Dahalan
Load shedding scheme based on frequency and voltage stability for an islanding operation of a distribution network connected to mini-hydro generation
description This paper presents a load shedding scheme (LSS) based on system frequency and voltage stability (VS). In the proposed scheme, the amount of power imbalance is determined using a rate of change of frequency, and the load shedding priority is carried out based on a VS index. The load with the highest tendency for voltage collapse (based on the index value) is given first priority to be shed. Thus, by shedding the most sensitive load, the distribution system can be saved from power collapse and then the system can return to its nominal state after load shedding. The proposed LSS is validated through simulation using PSCAD/EMTDC software on a Malaysian distribution network that consists of two mini-hydro generators. The simulation results show that the proposed scheme manages to shed the optimal amount of load when compared to conventional and adaptive frequency LSS. Moreover, apart from frequency stability, the proposed scheme also shows a significant improvement in the voltage profile of the islanded system.
format Article
author Norazliani, Md Sapari
Hazlie, Mokhlis
Javed, Ahmed Laghari
Halim, Abu Bakar
Hasmaini, Mohamad
Mohd Rohaimi, Mohd Dahalan
author_facet Norazliani, Md Sapari
Hazlie, Mokhlis
Javed, Ahmed Laghari
Halim, Abu Bakar
Hasmaini, Mohamad
Mohd Rohaimi, Mohd Dahalan
author_sort Norazliani, Md Sapari
title Load shedding scheme based on frequency and voltage stability for an islanding operation of a distribution network connected to mini-hydro generation
title_short Load shedding scheme based on frequency and voltage stability for an islanding operation of a distribution network connected to mini-hydro generation
title_full Load shedding scheme based on frequency and voltage stability for an islanding operation of a distribution network connected to mini-hydro generation
title_fullStr Load shedding scheme based on frequency and voltage stability for an islanding operation of a distribution network connected to mini-hydro generation
title_full_unstemmed Load shedding scheme based on frequency and voltage stability for an islanding operation of a distribution network connected to mini-hydro generation
title_sort load shedding scheme based on frequency and voltage stability for an islanding operation of a distribution network connected to mini-hydro generation
publisher Turkiye Klinikleri Journal of Medical Sciences
publishDate 2016
url http://umpir.ump.edu.my/id/eprint/27025/1/Load%20shedding%20scheme%20based%20on%20frequency%20and%20voltage.pdf
http://umpir.ump.edu.my/id/eprint/27025/
https://doi.org/10.3906/elk-1601-111
https://doi.org/10.3906/elk-1601-111
_version_ 1662754755129114624
score 13.214268