Load shedding scheme based on frequency and voltage stability for an islanding operation of a distribution network connected to mini-hydro generation
This paper presents a load shedding scheme (LSS) based on system frequency and voltage stability (VS). In the proposed scheme, the amount of power imbalance is determined using a rate of change of frequency, and the load shedding priority is carried out based on a VS index. The load with the highest...
Saved in:
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Turkiye Klinikleri Journal of Medical Sciences
2016
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/27025/1/Load%20shedding%20scheme%20based%20on%20frequency%20and%20voltage.pdf http://umpir.ump.edu.my/id/eprint/27025/ https://doi.org/10.3906/elk-1601-111 https://doi.org/10.3906/elk-1601-111 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.ump.umpir.27025 |
---|---|
record_format |
eprints |
spelling |
my.ump.umpir.270252020-03-23T03:10:54Z http://umpir.ump.edu.my/id/eprint/27025/ Load shedding scheme based on frequency and voltage stability for an islanding operation of a distribution network connected to mini-hydro generation Norazliani, Md Sapari Hazlie, Mokhlis Javed, Ahmed Laghari Halim, Abu Bakar Hasmaini, Mohamad Mohd Rohaimi, Mohd Dahalan T Technology (General) TK Electrical engineering. Electronics Nuclear engineering TP Chemical technology This paper presents a load shedding scheme (LSS) based on system frequency and voltage stability (VS). In the proposed scheme, the amount of power imbalance is determined using a rate of change of frequency, and the load shedding priority is carried out based on a VS index. The load with the highest tendency for voltage collapse (based on the index value) is given first priority to be shed. Thus, by shedding the most sensitive load, the distribution system can be saved from power collapse and then the system can return to its nominal state after load shedding. The proposed LSS is validated through simulation using PSCAD/EMTDC software on a Malaysian distribution network that consists of two mini-hydro generators. The simulation results show that the proposed scheme manages to shed the optimal amount of load when compared to conventional and adaptive frequency LSS. Moreover, apart from frequency stability, the proposed scheme also shows a significant improvement in the voltage profile of the islanded system. Turkiye Klinikleri Journal of Medical Sciences 2016-07-07 Article PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/27025/1/Load%20shedding%20scheme%20based%20on%20frequency%20and%20voltage.pdf Norazliani, Md Sapari and Hazlie, Mokhlis and Javed, Ahmed Laghari and Halim, Abu Bakar and Hasmaini, Mohamad and Mohd Rohaimi, Mohd Dahalan (2016) Load shedding scheme based on frequency and voltage stability for an islanding operation of a distribution network connected to mini-hydro generation. Turkish Journal of Electrical Engineering and Computer Sciences, 25 (3). pp. 1852-1863. ISSN 1300-0632 https://doi.org/10.3906/elk-1601-111 https://doi.org/10.3906/elk-1601-111 |
institution |
Universiti Malaysia Pahang |
building |
UMP Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Pahang |
content_source |
UMP Institutional Repository |
url_provider |
http://umpir.ump.edu.my/ |
language |
English |
topic |
T Technology (General) TK Electrical engineering. Electronics Nuclear engineering TP Chemical technology |
spellingShingle |
T Technology (General) TK Electrical engineering. Electronics Nuclear engineering TP Chemical technology Norazliani, Md Sapari Hazlie, Mokhlis Javed, Ahmed Laghari Halim, Abu Bakar Hasmaini, Mohamad Mohd Rohaimi, Mohd Dahalan Load shedding scheme based on frequency and voltage stability for an islanding operation of a distribution network connected to mini-hydro generation |
description |
This paper presents a load shedding scheme (LSS) based on system frequency and voltage stability (VS). In the proposed scheme, the amount of power imbalance is determined using a rate of change of frequency, and the load shedding priority is carried out based on a VS index. The load with the highest tendency for voltage collapse (based on the index value) is given first priority to be shed. Thus, by shedding the most sensitive load, the distribution system can be saved from power collapse and then the system can return to its nominal state after load shedding. The proposed LSS is validated through simulation using PSCAD/EMTDC software on a Malaysian distribution network that consists of two mini-hydro generators. The simulation results show that the proposed scheme manages to shed the optimal amount of load when compared to conventional and adaptive frequency LSS. Moreover, apart from frequency stability, the proposed scheme also shows a significant improvement in the voltage profile of the islanded system. |
format |
Article |
author |
Norazliani, Md Sapari Hazlie, Mokhlis Javed, Ahmed Laghari Halim, Abu Bakar Hasmaini, Mohamad Mohd Rohaimi, Mohd Dahalan |
author_facet |
Norazliani, Md Sapari Hazlie, Mokhlis Javed, Ahmed Laghari Halim, Abu Bakar Hasmaini, Mohamad Mohd Rohaimi, Mohd Dahalan |
author_sort |
Norazliani, Md Sapari |
title |
Load shedding scheme based on frequency and voltage stability for an islanding operation of a distribution network connected to mini-hydro generation |
title_short |
Load shedding scheme based on frequency and voltage stability for an islanding operation of a distribution network connected to mini-hydro generation |
title_full |
Load shedding scheme based on frequency and voltage stability for an islanding operation of a distribution network connected to mini-hydro generation |
title_fullStr |
Load shedding scheme based on frequency and voltage stability for an islanding operation of a distribution network connected to mini-hydro generation |
title_full_unstemmed |
Load shedding scheme based on frequency and voltage stability for an islanding operation of a distribution network connected to mini-hydro generation |
title_sort |
load shedding scheme based on frequency and voltage stability for an islanding operation of a distribution network connected to mini-hydro generation |
publisher |
Turkiye Klinikleri Journal of Medical Sciences |
publishDate |
2016 |
url |
http://umpir.ump.edu.my/id/eprint/27025/1/Load%20shedding%20scheme%20based%20on%20frequency%20and%20voltage.pdf http://umpir.ump.edu.my/id/eprint/27025/ https://doi.org/10.3906/elk-1601-111 https://doi.org/10.3906/elk-1601-111 |
_version_ |
1662754755129114624 |
score |
13.214268 |