Improving productivity using value stream mapping (VSM) - a case study
The presence of non-value added (NVA) activities in a production line will affect the productivity performance. This will lead to a high production cost due to non-value added activities are not in the customer specification. As a result more resources are required to fulfil the NVA activities. Iden...
Saved in:
Main Authors: | Ahmad Nasser, Mohd Rose, N. M. Z., Nik Mohamed, M. F. F., Ab Rashid, Hafizzudin, Mohd Noor, Alias, Mohd |
---|---|
Format: | Conference or Workshop Item |
Language: | English English |
Published: |
2019
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/26930/1/91.%20Improving%20productivity%20using%20value%20stream%20mapping%20%28VSM%29.pdf http://umpir.ump.edu.my/id/eprint/26930/2/91.1%20Improving%20productivity%20using%20value%20stream%20mapping%20%28VSM%29.pdf http://umpir.ump.edu.my/id/eprint/26930/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The study of value stream mapping (VSM) and Kanban in an automotive parts manufacturer
by: Nurul Syuhada, Desa
Published: (2014) -
Monitoring task performance using value stream mapping (VSM) technique
by: Omar, Mazni, et al.
Published: (2015) -
Value stream mapping (VSM) of production line for a high volume manufacturing industry
by: A.N., Mustafizul Karim, et al.
Published: (2012) -
Lead time reduction in SME by using value stream mapping (VSM) technique
by: Farah Liyana, Hassan
Published: (2013) -
Sustainable domain value stream mapping (SdVSM) framework application in aircraft maintenance: A case study
by: Kasava, Nithia Kumar, et al.
Published: (2015)