Investigating the relationship between site supervision and IBS based construction projects

Successful delivery of construction of Industrialized Building System (IBS) projects needs an effective supervisor’s that have a combination of strong technical, interpersonal, communication, and managerial skills. Unfortunately, a consistent finding is that there are many factors that affecting sit...

Full description

Saved in:
Bibliographic Details
Main Authors: Saad, M. Syamsyul H., W. R., Wan Salleh, R. A., Rahman, S. I., Doh
Format: Conference or Workshop Item
Language:English
Published: 2019
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/26579/1/Investigating%20the%20relationship%20between%20site%20supervision%20and%20IBS.pdf
http://umpir.ump.edu.my/id/eprint/26579/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.26579
record_format eprints
spelling my.ump.umpir.265792019-11-25T03:45:18Z http://umpir.ump.edu.my/id/eprint/26579/ Investigating the relationship between site supervision and IBS based construction projects Saad, M. Syamsyul H. W. R., Wan Salleh R. A., Rahman S. I., Doh TA Engineering (General). Civil engineering (General) TH Building construction Successful delivery of construction of Industrialized Building System (IBS) projects needs an effective supervisor’s that have a combination of strong technical, interpersonal, communication, and managerial skills. Unfortunately, a consistent finding is that there are many factors that affecting site supervision and most construction works are not delivered on time and consequently have a problem during installation of IBS. Therefore, the main aim of the study is to identify the factors affecting site supervision in improving IBS productivity. The study adopts a questionnaire survey approach to elicit information from the respondents, and out of the seventy questionnaires administered fifty-five were retrieved. The information and the data from the questionnaires were analyzed using the average index method. From the finding analysis, the main factors affecting site supervision is on-site construction process. While the main problem during installation of IBS is required planning on time delivery. It is recommended that the quality of IBS product or components should be enhanced to promote better site supervision. 2019 Conference or Workshop Item PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/26579/1/Investigating%20the%20relationship%20between%20site%20supervision%20and%20IBS.pdf Saad, M. Syamsyul H. and W. R., Wan Salleh and R. A., Rahman and S. I., Doh (2019) Investigating the relationship between site supervision and IBS based construction projects. In: Proceedings of 3rd National Conference on Wind & Earthquake Engineering and 1st International Seminar On Sustainable Construction Engineering (NCWE & ISSCE 2019), 12-13 July 2019 , Kuala Lumpur, Malaysia. pp. 274-279..
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic TA Engineering (General). Civil engineering (General)
TH Building construction
spellingShingle TA Engineering (General). Civil engineering (General)
TH Building construction
Saad, M. Syamsyul H.
W. R., Wan Salleh
R. A., Rahman
S. I., Doh
Investigating the relationship between site supervision and IBS based construction projects
description Successful delivery of construction of Industrialized Building System (IBS) projects needs an effective supervisor’s that have a combination of strong technical, interpersonal, communication, and managerial skills. Unfortunately, a consistent finding is that there are many factors that affecting site supervision and most construction works are not delivered on time and consequently have a problem during installation of IBS. Therefore, the main aim of the study is to identify the factors affecting site supervision in improving IBS productivity. The study adopts a questionnaire survey approach to elicit information from the respondents, and out of the seventy questionnaires administered fifty-five were retrieved. The information and the data from the questionnaires were analyzed using the average index method. From the finding analysis, the main factors affecting site supervision is on-site construction process. While the main problem during installation of IBS is required planning on time delivery. It is recommended that the quality of IBS product or components should be enhanced to promote better site supervision.
format Conference or Workshop Item
author Saad, M. Syamsyul H.
W. R., Wan Salleh
R. A., Rahman
S. I., Doh
author_facet Saad, M. Syamsyul H.
W. R., Wan Salleh
R. A., Rahman
S. I., Doh
author_sort Saad, M. Syamsyul H.
title Investigating the relationship between site supervision and IBS based construction projects
title_short Investigating the relationship between site supervision and IBS based construction projects
title_full Investigating the relationship between site supervision and IBS based construction projects
title_fullStr Investigating the relationship between site supervision and IBS based construction projects
title_full_unstemmed Investigating the relationship between site supervision and IBS based construction projects
title_sort investigating the relationship between site supervision and ibs based construction projects
publishDate 2019
url http://umpir.ump.edu.my/id/eprint/26579/1/Investigating%20the%20relationship%20between%20site%20supervision%20and%20IBS.pdf
http://umpir.ump.edu.my/id/eprint/26579/
_version_ 1651866985671163904
score 13.2014675