The analysis of factors contributed to delay and method to analyze the delay in construction project

Delay is one of the major problems in construction industry. Therefore, it is common for construction project to encounter delays. There are various factors identified in the project life cycle that will influence the construction time, thus leading to delay. Analyzing the various causes that contr...

Full description

Saved in:
Bibliographic Details
Main Author: Mohammad Solhi, Mohammed
Format: Undergraduates Project Papers
Language:English
Published: 2010
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/2418/1/MOHAMMAD_SOLHI_BIN_MOHAMMED.PDF
http://umpir.ump.edu.my/id/eprint/2418/
http://iportal.ump.edu.my/lib/item?id=chamo:52422&theme=UMP2
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.2418
record_format eprints
spelling my.ump.umpir.24182016-06-24T03:35:36Z http://umpir.ump.edu.my/id/eprint/2418/ The analysis of factors contributed to delay and method to analyze the delay in construction project Mohammad Solhi, Mohammed TH Building construction Delay is one of the major problems in construction industry. Therefore, it is common for construction project to encounter delays. There are various factors identified in the project life cycle that will influence the construction time, thus leading to delay. Analyzing the various causes that contribute to project's delay is an important task to resolve it. Thus, the aim of this study is to identify the contribution factors of delay and highlight a common method for analyzing delay in construction project. Data is gathered from respondents of questionnaire survey who were involved in construction project. Microsoft Excel software was used to analyze the data collected in terms of agreed percentages of respondents and relative index value. From the survey, financial problems were identified as the main factors that lead to the delay in construction projects. As a conclusion, analysis shows that completion of the project on schedule is a difficult task to accomplish due to the complexity, multiparty and dynamic environment of construction. So, various methods have been developed in order to measure the impact of delay. It is established in this study that As-Planned CPM Technique, "But For" Analysis Using As-Planned CPM and Impacted As-Built CPM is the most preferred method of analyzing delay for construction projects. 2010-11 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/2418/1/MOHAMMAD_SOLHI_BIN_MOHAMMED.PDF Mohammad Solhi, Mohammed (2010) The analysis of factors contributed to delay and method to analyze the delay in construction project. Faculty Of Civil Engineering & Earth Resources, Universiti Malaysia Pahang. http://iportal.ump.edu.my/lib/item?id=chamo:52422&theme=UMP2
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Mohammad Solhi, Mohammed
The analysis of factors contributed to delay and method to analyze the delay in construction project
description Delay is one of the major problems in construction industry. Therefore, it is common for construction project to encounter delays. There are various factors identified in the project life cycle that will influence the construction time, thus leading to delay. Analyzing the various causes that contribute to project's delay is an important task to resolve it. Thus, the aim of this study is to identify the contribution factors of delay and highlight a common method for analyzing delay in construction project. Data is gathered from respondents of questionnaire survey who were involved in construction project. Microsoft Excel software was used to analyze the data collected in terms of agreed percentages of respondents and relative index value. From the survey, financial problems were identified as the main factors that lead to the delay in construction projects. As a conclusion, analysis shows that completion of the project on schedule is a difficult task to accomplish due to the complexity, multiparty and dynamic environment of construction. So, various methods have been developed in order to measure the impact of delay. It is established in this study that As-Planned CPM Technique, "But For" Analysis Using As-Planned CPM and Impacted As-Built CPM is the most preferred method of analyzing delay for construction projects.
format Undergraduates Project Papers
author Mohammad Solhi, Mohammed
author_facet Mohammad Solhi, Mohammed
author_sort Mohammad Solhi, Mohammed
title The analysis of factors contributed to delay and method to analyze the delay in construction project
title_short The analysis of factors contributed to delay and method to analyze the delay in construction project
title_full The analysis of factors contributed to delay and method to analyze the delay in construction project
title_fullStr The analysis of factors contributed to delay and method to analyze the delay in construction project
title_full_unstemmed The analysis of factors contributed to delay and method to analyze the delay in construction project
title_sort analysis of factors contributed to delay and method to analyze the delay in construction project
publishDate 2010
url http://umpir.ump.edu.my/id/eprint/2418/1/MOHAMMAD_SOLHI_BIN_MOHAMMED.PDF
http://umpir.ump.edu.my/id/eprint/2418/
http://iportal.ump.edu.my/lib/item?id=chamo:52422&theme=UMP2
_version_ 1643664611254206464
score 13.18916