4P delays in project management

Purpose - As a result of the increasing challenges of time overrun, several companies regularly set up delay assessment procedures for performance improvement and profit maximization. In the construction industry, projects are enormously complicated and involve significant budgets, and therefore opt...

Full description

Saved in:
Bibliographic Details
Main Authors: Ansah, Richard Hannis, Sorooshian, Shahryar
Format: Article
Language:English
Published: Emerald 2018
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/23936/1/4P%20delays%20in%20project%20management.pdf
http://umpir.ump.edu.my/id/eprint/23936/
https://doi.org/10.1108/ECAM-09-2016-0199
https://doi.org/10.1108/ECAM-09-2016-0199
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.23936
record_format eprints
spelling my.ump.umpir.239362020-02-21T07:48:23Z http://umpir.ump.edu.my/id/eprint/23936/ 4P delays in project management Ansah, Richard Hannis Sorooshian, Shahryar AM Museums (General). Collectors and collecting (General) Purpose - As a result of the increasing challenges of time overrun, several companies regularly set up delay assessment procedures for performance improvement and profit maximization. In the construction industry, projects are enormously complicated and involve significant budgets, and therefore optimizing project performance through the root cause analysis should be imperative for every project manager. Typically issues of delays in projects are generally discussed and problematized separately, yet a comprehensive framework for systematic analysis and grouping of delays is rarely contended. The purpose of this paper is to introduce the 4P concept (project related, practices, participants, and procurement) for identifying, analyzing, and classifying delays in the internal environment of the project development process. Design/methodology/approach - The 4P conceptual framework was validated through the synthesis of the existing literature. Findings - Interestingly, despite the increasing concerns about delays in the construction industry, most research on delays are project and/or country specific, thus no consensus about the sources of delays. The application of the proposed concept as a theoretical framework would provide an understanding of the available delay sources, their risks and use for project delay assessment and classification. Research limitations/implications - This study grouped delays based on the shared characteristics and four main sources were identified and analyzed. There may be other sources or factors, yet would be dependent or aspect of the 4P. Practical implications - The study informs project teams to reduce delays in the construction industry. Originality/value - The paper is an application of risk assessment tool to conceptualize delays in the internal project environment. Emerald 2018 Article PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/23936/1/4P%20delays%20in%20project%20management.pdf Ansah, Richard Hannis and Sorooshian, Shahryar (2018) 4P delays in project management. Engineering, Construction and Architectural Management, 25 (1). pp. 62-76. ISSN 0969-9988 (Print); 1365-232X (Online) https://doi.org/10.1108/ECAM-09-2016-0199 https://doi.org/10.1108/ECAM-09-2016-0199
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic AM Museums (General). Collectors and collecting (General)
spellingShingle AM Museums (General). Collectors and collecting (General)
Ansah, Richard Hannis
Sorooshian, Shahryar
4P delays in project management
description Purpose - As a result of the increasing challenges of time overrun, several companies regularly set up delay assessment procedures for performance improvement and profit maximization. In the construction industry, projects are enormously complicated and involve significant budgets, and therefore optimizing project performance through the root cause analysis should be imperative for every project manager. Typically issues of delays in projects are generally discussed and problematized separately, yet a comprehensive framework for systematic analysis and grouping of delays is rarely contended. The purpose of this paper is to introduce the 4P concept (project related, practices, participants, and procurement) for identifying, analyzing, and classifying delays in the internal environment of the project development process. Design/methodology/approach - The 4P conceptual framework was validated through the synthesis of the existing literature. Findings - Interestingly, despite the increasing concerns about delays in the construction industry, most research on delays are project and/or country specific, thus no consensus about the sources of delays. The application of the proposed concept as a theoretical framework would provide an understanding of the available delay sources, their risks and use for project delay assessment and classification. Research limitations/implications - This study grouped delays based on the shared characteristics and four main sources were identified and analyzed. There may be other sources or factors, yet would be dependent or aspect of the 4P. Practical implications - The study informs project teams to reduce delays in the construction industry. Originality/value - The paper is an application of risk assessment tool to conceptualize delays in the internal project environment.
format Article
author Ansah, Richard Hannis
Sorooshian, Shahryar
author_facet Ansah, Richard Hannis
Sorooshian, Shahryar
author_sort Ansah, Richard Hannis
title 4P delays in project management
title_short 4P delays in project management
title_full 4P delays in project management
title_fullStr 4P delays in project management
title_full_unstemmed 4P delays in project management
title_sort 4p delays in project management
publisher Emerald
publishDate 2018
url http://umpir.ump.edu.my/id/eprint/23936/1/4P%20delays%20in%20project%20management.pdf
http://umpir.ump.edu.my/id/eprint/23936/
https://doi.org/10.1108/ECAM-09-2016-0199
https://doi.org/10.1108/ECAM-09-2016-0199
_version_ 1662754712465702912
score 13.159267