Estimation on amount of steel reinforcement for six storey hospital building with seismic design consideration in Malaysia

A series of earthquakes such as Sumatra-Andaman earthquake on 26 December 2004, Nias earthquake on 28 March 2005, and Bengkulu earthquake on 12 December 2007 hadinfluences to a series of subsequence local earthquake in Peninsular Malaysia. Recently, East Malaysia especially Sabah has become earthqua...

Full description

Saved in:
Bibliographic Details
Main Authors: M. I., Adiyanto, F., Ahmad Jani, S. A. H., S. Mustapha, Saffuan, Wan Ahmad
Format: Conference or Workshop Item
Language:English
English
Published: IOP Publishing 2019
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/23406/1/6.1%20Estimation%20on%20amount%20of%20steel%20reinforcement%20for%20six.pdf
http://umpir.ump.edu.my/id/eprint/23406/7/4%20Estimation%20on%20amount%20of%20steel%20reinforcement%20for%20six%20storey%20hospital.pdf
http://umpir.ump.edu.my/id/eprint/23406/
https://doi.org/10.1088/1755-1315/244/1/012015
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.23406
record_format eprints
spelling my.ump.umpir.234062019-03-18T00:54:33Z http://umpir.ump.edu.my/id/eprint/23406/ Estimation on amount of steel reinforcement for six storey hospital building with seismic design consideration in Malaysia M. I., Adiyanto F., Ahmad Jani S. A. H., S. Mustapha Saffuan, Wan Ahmad TA Engineering (General). Civil engineering (General) A series of earthquakes such as Sumatra-Andaman earthquake on 26 December 2004, Nias earthquake on 28 March 2005, and Bengkulu earthquake on 12 December 2007 hadinfluences to a series of subsequence local earthquake in Peninsular Malaysia. Recently, East Malaysia especially Sabah has become earthquake prone region due to local fault. Hence, Malaysia is not totally free from seismic activities. Therefore, in 2009 Malaysian Public Work Department had concluded that it was worthwhile to consider seismic design input in new building which are located in medium to high risk earthquake zone. The effect of seismic design implementation on cost of materials has become an interesting topic to discuss. This study presents the estimation of steel reinforcement required for six storey hospital building in Malaysia with seismic design consideration. Two parameters namely as reference peak ground acceleration and class of ductility has been considered as variable. The result shows that the total amount of steel reinforcement is increased from 6%, 116%, 257%, and 290% for peak ground acceleration equal to 0.04g, 0.08g, 0.12g, and 0.16g, respectively compared to the non- seismic design counterpart. Beside, total amount of steel reinforcement is increase around 6% and 145% for ductility class medium and ductility class low, respectively compared to its non- seismic design counterpart. IOP Publishing 2019 Conference or Workshop Item PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/23406/1/6.1%20Estimation%20on%20amount%20of%20steel%20reinforcement%20for%20six.pdf pdf en cc_by http://umpir.ump.edu.my/id/eprint/23406/7/4%20Estimation%20on%20amount%20of%20steel%20reinforcement%20for%20six%20storey%20hospital.pdf M. I., Adiyanto and F., Ahmad Jani and S. A. H., S. Mustapha and Saffuan, Wan Ahmad (2019) Estimation on amount of steel reinforcement for six storey hospital building with seismic design consideration in Malaysia. In: IOP Conference Series: Earth and Environmental Science, National Colloquium on Wind and Earthquake Engineering, 17-18 August 2018 , Kuantan, Pahang, Malaysia. pp. 1-7., 244 (012015). ISSN 1755-1315 https://doi.org/10.1088/1755-1315/244/1/012015
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
M. I., Adiyanto
F., Ahmad Jani
S. A. H., S. Mustapha
Saffuan, Wan Ahmad
Estimation on amount of steel reinforcement for six storey hospital building with seismic design consideration in Malaysia
description A series of earthquakes such as Sumatra-Andaman earthquake on 26 December 2004, Nias earthquake on 28 March 2005, and Bengkulu earthquake on 12 December 2007 hadinfluences to a series of subsequence local earthquake in Peninsular Malaysia. Recently, East Malaysia especially Sabah has become earthquake prone region due to local fault. Hence, Malaysia is not totally free from seismic activities. Therefore, in 2009 Malaysian Public Work Department had concluded that it was worthwhile to consider seismic design input in new building which are located in medium to high risk earthquake zone. The effect of seismic design implementation on cost of materials has become an interesting topic to discuss. This study presents the estimation of steel reinforcement required for six storey hospital building in Malaysia with seismic design consideration. Two parameters namely as reference peak ground acceleration and class of ductility has been considered as variable. The result shows that the total amount of steel reinforcement is increased from 6%, 116%, 257%, and 290% for peak ground acceleration equal to 0.04g, 0.08g, 0.12g, and 0.16g, respectively compared to the non- seismic design counterpart. Beside, total amount of steel reinforcement is increase around 6% and 145% for ductility class medium and ductility class low, respectively compared to its non- seismic design counterpart.
format Conference or Workshop Item
author M. I., Adiyanto
F., Ahmad Jani
S. A. H., S. Mustapha
Saffuan, Wan Ahmad
author_facet M. I., Adiyanto
F., Ahmad Jani
S. A. H., S. Mustapha
Saffuan, Wan Ahmad
author_sort M. I., Adiyanto
title Estimation on amount of steel reinforcement for six storey hospital building with seismic design consideration in Malaysia
title_short Estimation on amount of steel reinforcement for six storey hospital building with seismic design consideration in Malaysia
title_full Estimation on amount of steel reinforcement for six storey hospital building with seismic design consideration in Malaysia
title_fullStr Estimation on amount of steel reinforcement for six storey hospital building with seismic design consideration in Malaysia
title_full_unstemmed Estimation on amount of steel reinforcement for six storey hospital building with seismic design consideration in Malaysia
title_sort estimation on amount of steel reinforcement for six storey hospital building with seismic design consideration in malaysia
publisher IOP Publishing
publishDate 2019
url http://umpir.ump.edu.my/id/eprint/23406/1/6.1%20Estimation%20on%20amount%20of%20steel%20reinforcement%20for%20six.pdf
http://umpir.ump.edu.my/id/eprint/23406/7/4%20Estimation%20on%20amount%20of%20steel%20reinforcement%20for%20six%20storey%20hospital.pdf
http://umpir.ump.edu.my/id/eprint/23406/
https://doi.org/10.1088/1755-1315/244/1/012015
_version_ 1643669590341844992
score 13.18916