Design an air conditioning system for UMP mosque
This project is carried out to design a suitable air conditioning system for UMP Mosque. The architectural drawing of UMP mosque is studied first to choose the best air conditioner to be installed in UMP Mosque. Tropical country such as Malaysia is hot and humid. Taking UMP Mosque as an example, dur...
Saved in:
Main Author: | |
---|---|
Format: | Undergraduates Project Papers |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/22510/1/15.Design%20an%20air%20conditioning%20system%20for%20UMP%20mosque.pdf http://umpir.ump.edu.my/id/eprint/22510/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.ump.umpir.22510 |
---|---|
record_format |
eprints |
spelling |
my.ump.umpir.225102023-09-07T07:31:56Z http://umpir.ump.edu.my/id/eprint/22510/ Design an air conditioning system for UMP mosque Mohd Hilmi, Tajud Hassan TH Building construction This project is carried out to design a suitable air conditioning system for UMP Mosque. The architectural drawing of UMP mosque is studied first to choose the best air conditioner to be installed in UMP Mosque. Tropical country such as Malaysia is hot and humid. Taking UMP Mosque as an example, during Friday Prayer there is about 1300 Muslims perform Friday Prayer inside UMP Mosque. This situation makes the Muslims feel not comfortable with this condition. Therefore an air conditioning system should be installed in the UMP Mosque to provide comfort to the occupants. The objective of this project is to calculate the heat gains in UMP Mosque. The purpose of calculating the heat gain is to determine the total cooling load required. Another objective is to design a suitable air conditioning system for UMP Mosque. Designing the ductwork, determination of duct size, selection of suitable space to locate the air handling unit (AWl) is done in the design of the air conditioning system. The highest heat gain in UMP Mosque is at 4.00 pm on the daily basis. The total heat gain at 4.00 pm hour is 171.8 W. However, the peak heat gain of 781.4 kW occurs during Friday prayer. Thus, the value of total heat gain during Friday Prayer is used to design the air conditioning system for TJIMP Mosque. The AHUs used are unitary system and each AHU connected with one duct. 2009-05 Undergraduates Project Papers NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/22510/1/15.Design%20an%20air%20conditioning%20system%20for%20UMP%20mosque.pdf Mohd Hilmi, Tajud Hassan (2009) Design an air conditioning system for UMP mosque. Faculty of Mechanical Engineering, Universiti Malaysia Pahang. |
institution |
Universiti Malaysia Pahang |
building |
UMP Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Pahang |
content_source |
UMP Institutional Repository |
url_provider |
http://umpir.ump.edu.my/ |
language |
English |
topic |
TH Building construction |
spellingShingle |
TH Building construction Mohd Hilmi, Tajud Hassan Design an air conditioning system for UMP mosque |
description |
This project is carried out to design a suitable air conditioning system for UMP Mosque. The architectural drawing of UMP mosque is studied first to choose the best air conditioner to be installed in UMP Mosque. Tropical country such as Malaysia is hot and humid. Taking UMP Mosque as an example, during Friday Prayer there is about 1300 Muslims perform Friday Prayer inside UMP Mosque. This situation makes the Muslims feel not comfortable with this condition. Therefore an air conditioning system should be installed in the UMP Mosque to provide comfort to the occupants. The objective of this project is to calculate the heat gains in UMP Mosque. The purpose of calculating the heat gain is to determine the total cooling load required. Another objective is to design a suitable air conditioning system for UMP Mosque. Designing the ductwork, determination of duct size, selection of suitable space to locate the air handling unit (AWl) is done in the design of the air conditioning system. The highest heat gain in UMP Mosque is at 4.00 pm on the daily basis. The total heat gain at 4.00 pm hour is 171.8 W. However, the peak heat gain of 781.4 kW occurs during Friday prayer. Thus, the value of total heat gain during Friday Prayer is used to design the air conditioning system for TJIMP Mosque. The AHUs used are unitary system and each AHU connected with one duct. |
format |
Undergraduates Project Papers |
author |
Mohd Hilmi, Tajud Hassan |
author_facet |
Mohd Hilmi, Tajud Hassan |
author_sort |
Mohd Hilmi, Tajud Hassan |
title |
Design an air conditioning system for UMP mosque |
title_short |
Design an air conditioning system for UMP mosque |
title_full |
Design an air conditioning system for UMP mosque |
title_fullStr |
Design an air conditioning system for UMP mosque |
title_full_unstemmed |
Design an air conditioning system for UMP mosque |
title_sort |
design an air conditioning system for ump mosque |
publishDate |
2009 |
url |
http://umpir.ump.edu.my/id/eprint/22510/1/15.Design%20an%20air%20conditioning%20system%20for%20UMP%20mosque.pdf http://umpir.ump.edu.my/id/eprint/22510/ |
_version_ |
1778161063233060864 |
score |
13.209306 |